合同管理关键控制点优选九篇

时间:2023-06-16 16:44:35

引言:易发表网凭借丰富的文秘实践,为您精心挑选了九篇合同管理关键控制点范例。如需获取更多原创内容,可随时联系我们的客服老师。

合同管理关键控制点

第1篇

关键词:核电厂仪控系统软件;软件质量评价

中图分类号:TP319 文献标识码:A 文章编号:1009-3044(2017)06-0125-02

Abstract: The design and development of software quality evaluation management system which used in instrument and control (I&C) system of nuclear power plant is based on the GB/T 18905-2002 and open-source code. User can customize and select proper set of evaluation standard according to the different quality objectives to evaluate and quantify the quality of I&C system software in nuclear power plant objectively.

Key words: I&C software of nuclear power plant; software quality evaluation

件产品在工控领域内的地位变得越来越重要,作为核电厂控制核心的集散控制系统(Distributed Control System,以下简称DCS)更是发挥着十分重要的作用。特别是在核电厂DCS国产化进程中,DCS软件产品的研制普遍存在任务重、质量要求和可靠性要求高的特点。如何对自主研发的核电厂仪控系统软件的质量进行高效、客观的评价也变得十分迫切。随着核电厂仪控系统软件产品日趋复杂和庞大,相应的软件产品质量评价工作包含着更多的数据信息,如果仅靠手工或word、excel工具来管理这些数据,工作量巨大而且容易出现错误,数据信息不能及时得到更新,导致评价过程难以执行和评价效率低下。

作者以GB/T 18905-2002 软件工程 产品评价系列标准的思想为依托设计出一种对软件质量的评价过程进行管理的系统,具体业务流程完全符合GB/T 18905-2002中对软件质量评价过程的定义。

作者基于开源代码开发出的该评价管理系统,采用B/S架构,客户端(通过浏览器)和服务器建立TCP连接,主要负责软件质量评价流程业务处理;服务器端(Web服务器)使用Apache+PHP+MySQL配置,服务器端对客户端发出的请求按照HTTP协议进行解码,主要负责项目数据处理,包括数据库操作、数据统计、软件质量评价过程文档生成等。

由于核电厂仪控系统软件的特殊性,不同安全级别的软件必须符合国家、国际标准规定。尤其是其安全性和可靠性必须严格遵照IEC 60880-2006、IEC 62138-2004、IEC 61513-2011和NUREG/CR 6101-1993中的要求,该评价管理系统提供符合核电厂仪控系统软件评价标准的软件质量模型库,同时具备良好的可扩展性,用户可以根据不同软件质量目的进行自定义和裁剪。

1 软件的主要功能

该系统的主要功能如下:

根据GB/T 18905-2002建立一个软件质量评价流程体系,支持软件质量和软件过程的持续改进

提供核电厂仪控软件专属的质量属性和度量标准(即质量模型),帮助评价者根据不同的项目进行裁剪:

1) 基于GB/T 16260-2006提供软件的内部质量度量、外部质量度量、使用质量度量模型库;

2) 基于IEC 62645-2014、IEC 6244-2013 提供核电厂仪控系统软件信息安全相关的质量度量模型库;

3) 基于GB/T 7826-2012、GB/T 2817-2011提供核电厂仪控软件可靠性相关的质量度量模型库;

对所收集的数据进行分析统计,帮助用户有效地了解软件质量评价结果,分析软件开发中发现的问题和风险;

提供报表生成功能,生成评价需求规格说明书、评价计划、评价报告等过程文档。

2 软件用户设置

在系统中,每个用户都可以维护自己的私有信息。admin可以创建用户,但不能看到其它用户的密码。

该系统提供了六种角色,分别是V&V engineer、guest、V&V designer 、senior V&V engineer、V&V leader、admin。相对应的功能权限可以通过角色管理进行自定义。

3 软件操作流程

3.1创建软件评价项目

通过主页左边的列表栏的【评价项目管理】菜单,进入创建页面中有【创建】按钮创建新的待评价的软件项目,本系统可以对多项目进行管理,而且各个项目之间是独立的,不能分享数据,但只有admin级的用户可以设置项目。Admin进行项目设置后,V&V人员就可以进行项目评价需求、项目评价规定、评价计划以及评价执行等相关工作。

3.2创建评价需求

评价需求规格说明书应该由GB/T 16260-2006中定义的称为【质量特性】的一系列质量需求点组成。

评价需求规格说明书是开展评价工作的依据。首先,对软件的需求规格书进行分析和整理,将其拆分为多个评价需求点。

创建评价需求规格说明书

建评价需求点

3.2.1创建评价需求规格说明书

主页左边的列表栏中有 【评价需求管理】的菜单,子菜单中有【评价需求规格说明书】,可以添加编辑评价需求规格说明书。

3.2.2创建评价需求点

选择需要编辑的评价需求规格说明书,选择该页面上的【创建评价需求点】按钮新建评价需求点。

评价需求点内容包含:需求点的标识、名称、概述、需求的状态,需求的类型,以及对应的评价方法数。

该管理系统提供了两种状态来管理评价需求点:有效的、不可评价的。

另外,管理系统提供了从文件导入需求点的功能,支持的文件类型有csv和xml、DocBook三种。同时系统也提供了将需求导出的功能,支持的文件类型有xml一种。 管理系统还提供上传文件的功能,可以在创建评价需求点的时候,为该需求点附上相关的文档。

3.3评价规定

评价规定的目的是定义评价的范围和定义对供评价的产品及各种部件执行的测量,按照评价需求进行评价设计。评价规定宜详细到在它的基础上能确保评价的可重复性和可再现性。规定评价的活动主要有:

质量模型的导入和裁剪;

评价方法的设计;

3.3.1质量模型的导入和裁剪

选择主页横向导航栏中的【评价质量模型裁剪/评价设计】出现评价质量模型操作界面,选择【导入评价质量模型】 将本管理系统适用的评价质量模型导入待评价的项目中。选择评价的质量模型文件(.xml格式)进行上传。

3.3.2评价方法设计

选择【评价方法设计】,进入评价方法设计页面进行设计。评价方法设计的要素包括:方法设计、期望结果。

3.4评价计划

在本管理系统系统中,评价者应制定一个评价计划来描述执行指定评价时所需要的资源和执行各种动作时对这些资源的分配,一个完整的评价计划包括:

创建评价计划

评价版本管理

指派评价计划角色

添加/删除评价标准到评价计划

分配执行评价任务

3.4.1创建评价计划

选中主页右上【评价计划管理】模块下的【评价计划管理】菜单。通过【增加】按钮,进入评价计划创建页面。评价计划的内容包括:计划名称,计划描述,以及是否从已有的评价计划创建,如果选择从已有的评价计划中创建,则新创建的评价计划包含选择的已有评价计划的所有相关联的信息,比如已有评价计划分配的评价方法。

3.4.2评价版本管理

选中主页右上方【评价计划管理】模块下的【评价版本管理】菜单,创建一个新的评价版本。评价版本的内容包括:输入版本的标识,版本的说明。

3.4.3指派评价计划角色

选择主页【评价计划管理】模块下的【分配评价计划角色】菜单,为评价计划指派用户。

在分配评价计划角色页面,可以将该评价计划以不同的角色分配给不同的用户,通过角色列表,可以选择用户对该评价计划的操作角色。

3.4.4添加/删除评价标准到评价计划

在主页通过评价计划下拉列表,先选择一个评价计划,选择【评价计划管理】下的【添加评价标准到评价计划】按钮,进入向评价计划中筛选评价标准的界面。

将已经导入好的评价标准加入到该评价计划。选择一个评价标准集,可以看到该评价标准及下的所有评价标准。

选择该评价计划中要执行的评价标准,根据版本下拉列表来选择该评价计划下需要执行的评价标准的版本。选择好后,选择【增加选择的评价标准】按钮,可以将选择好的评价标准分配给该评价计划。选择【添加/删除选择的评价标准】按钮,可以将选择好的评价标准移除该评价计划。

3.4.5分配执行评价任务

选择主页【评价计划管理】模块下的【分配执行评价任务】菜单,进入分配执行评价任务页面,可以为当前评价计划中所包含的每个评价标准指定一个具体的执行人员。

3.5执行评价

执行评价的目的是根据评价需求,按照评价规定中的评价规定和评价计划中的计划,对软件产品的测量和验证中获得结果。

选择主页横向导航栏中的【执行评价】进入执行页面。

执行完评价方法后,在【说明/描述】输入框中输入在执行评价过程中的一些说明性情况,在【结果】栏选择评价执行的结果。

其中评价结果分四种情况:

未执行:该评价标准没有执行

通过:该评价标准通过

失败:该评价标准没有执行成功

中断:由于其他评价标准失败,导致该评价标准无法执行,被中断。

3.6评价结果分析

本管理系统根据评价过程中记录的数据,提供了多种度量统计功能,可以直观的得到评价管理过程中需要进行分析和总结的数据。选择主页横向导航栏中的【评价报告和度量】或者评价执行模块中的【评价报告和度量】,即可进入评价结果报告页面。

4 结论

本系统可以指导评价者更加高效地进行软件质量评价。它可以保证过程数据得以及时和准确地收集,通过软件的监督使整个评价过程符合标准,并得以实施和贯彻,为持续改进核电厂仪控系统软件质量和软件过程改进提供基础。旨在为评价过程提供系统化的指导,减少评价过程的成本和时间,提高对整个软件产品评价管理过程的可控性。

参考文献:

第2篇

目的:探讨改进分离系统在制备手工分离浓缩血小板中的关键控制点和优势。方法:将随机抽取符合《献血者健康检查要求》(GB184672001)的献血者血液100例分成常规分离系统组和改进分离系统组,通过相同的制备方法生产手工分离浓缩血小板,比较其血小板回收率;专人采用改进分离系统制备手工分离浓缩血小板45例以确定改进分离系统标准操作规程;再依据此标准操作规程制备手工分离浓缩血小板随机抽检130例,验证产品质量。结果:常规分离系统制备手工分离浓缩血小板其血小板回收率为(57.44±14.59)%,改进分离系统血小板回收率为(82.94±9.31)%,通过随机抽检手工分离浓缩血小板产品,其质量符合《全血及成分血质量要求》(GB184692001)。结论:利用改进分离系统制备手工分离浓缩血小板其血小板的回收率高于常规分离系统,该制备方法优于常规分离系统且能够保证产品质量。

【关键词】 手工分离浓缩血小板;常规分离系统;改进分离系统;回收率

[ABSTRACT] Objective: To discuss the key control point and superiority of the improved isolation system in manually preparing condensed platelet. Methods:Divided 100 blood samples fitting with criteria for blood donors(GB184672001)by stochastic sampling test into two groups, regular isolation system group and improved isolation system group.Manually prepared condensed platelet by the same method, and compared the recovery rate. With improved isolation system, prepared 45 samples of condensed platelet to make the operation standard, based on which randomly tested other 130 samples for quality checking.Results:The recovery rate of manually condensed platelet with regular isolation system was (57.44±14.59)%, and (82.94±9.31)% with improved isolation system. Stochastic sampling test showed that all samples tested randomly were qualified based on the standards for whole blood and blood component quality(GB184692001).Conclusion:The recovery rate of manually condensed platelet by the improved isolation system is higher than that with regular one,and the improved siolation system is better in guaranteeing the quality of manually condensed platelet.

[KEY WORDS]Manually condensed platelet; Regular isolation system; Improved isolation system;Recovery rate

新型分离系统制备手工浓缩血小板的关键控制点和效果评价 近年来,随着血细胞分离机的推广应用,机采血小板的用量明显大于手工分离浓缩血小板。随着卫生部318号令的颁布实施,目前在我国许多省市出现机采血小板和手工分离浓缩血小板并存的现象。那么如何控制手工分离浓缩血小板的质量就成为尤为重要的问题,以往用白膜回浆法生产制备手工浓缩血小板时,常常是利用常规分离系统即一次性采血三联袋用无菌接口机连续接口转移袋2次,生产制备该产品。由于需连续接口转移袋2次,使分离白膜后用血浆将管路中的白膜冲回白膜袋难以实现;再者转移袋的空辫长,常使白膜层附着于管路中,导致血小板回收率不够高。为此,我中心与某公司联合开发了改进分离系统即一次性采血五联袋生产制备手工浓缩血小板,大大提高了血小板回收率,现报告如下。

1 材料与方法

1.1 主要材料

常规分离系统即一次性采血三联袋,改进分离系统即一次性采血五联袋(图1a、图1b),无菌接口机(德国费森尤斯,日本泰尔茂),SORVALL3BP离心机(美国索福公司)。

1.2 血液来源和方法

依据1997版《中国输血技术操作规程血站部分》的要求[1],随机抽取符合《献血者健康检查要求》(GB18467-2001)体检合格的全血100袋[2],将100袋全血随机分成常规分离系统和改进分离系统两组,每组50袋,通过相同的制备方法生产手工分离浓缩血小板,比较其血小板回收率;专人采用改进分离系统制备手工分离浓缩血小板45例以确定改进分离系统标准操作规程;再依据标准操作规程,培训工作人员,经能力评估合格上岗后,随机抽检所制备的手工分离浓缩血小板130例,验证产品质量。

全血经过重离心,将白细胞和血小板沉降在红细胞的上层,形成白膜层,收集白膜层,用血浆悬浮白膜层,轻离心后制备分离出浓缩血小板。

1.4 制备过程

1.4.1 技术培训

所有上岗人员必须具有相关专业初级专业技术职称,经血液安全及专业技术培训,具有基础理论知识和实际操作技能,并通过能力评估能够胜任所分配的职责。

1.4.2 常规分离系统制备

即应用常规一次性采血三联袋制备手工分离浓缩血小板。在全血袋血辫上利用无菌接管机连接一个50 mL消毒空袋后离心。第一次重离心,转速2 800转,时间15 min,分离白膜于50 mL空袋中;热合下白膜袋再利用无菌接管机连接一个50 mL消毒空袋后第2次轻离心,转速1 000转,时间 5 min,分出上层浓缩血小板。离心温度均为20~24℃。

1.4.3 改进分离系统制备

即在常规一次性采血三联袋的基础上增加两个50 mL二联袋,将采集在改进后的联袋的全血离心,第一次重离心的条件同常规分离系统,分离少许血浆于50 mL二联袋中的血小板袋中,再分离白膜于50 mL二联袋中的白膜袋中,再用血小板袋中的少许血浆控制好容量回冲管路中的白膜于白膜袋中实现"白膜回浆法",将血小板袋中的剩余血浆返回采血袋中,热合下二联袋,第二次轻离心,离心的条件同常规分离系统,分出上层浓缩血小板。离心温度均为20~24℃。

1.5 统计学处理

总体均值根据大样本的均数采用μ检验,检验水准α=0.05。

2 结果

改进分离系统制备手工分离浓缩血小板其血小板的回收率高于常规分离系统,说明该制备过程优于常规分离系统见表1。表1 常规分离系统和改进分离系统制备手工分离浓缩血小板(略)

由同一人采用改进分离系统制备手工分离浓缩血小板,其分离手法和分离系统均是最佳的制备过程,可作为制备手工分离浓缩血小板的标准操作规程见表2。表2 专人采用改进分离系统制备手工分离浓缩血小板(略)

随机抽检所有具有上岗资格人员,采用经确认的改进分离系统标准操作规程制备的手工分离浓缩血小板,其产品质量符合《全血及成分血质量要求》(GB184692001)[3],见表3。表3 130份手工分离浓缩血小板质量检测结果(略)

3 讨论

3.1 手工分离浓缩血小板的优越性

欧美临床应用的血小板始终以手工采集为主,欧洲14个成员国手工分离浓缩血小板占临床所需血小板的51.3%,单采血小板占48.7%。手工分离浓缩血小板首先可以使采集的全血中的血小板得到充分利用,避免这一资源的浪费;其次,手工分离浓缩血小板价格较机采血小板低,容易为经济条件差的病人所接受;第三,从全血中分离白膜再获得血小板,可以减少全血保存后微聚物的形成,降低受血者发生肺部、脑部栓塞的危险性,使非溶血性输血反应的发生率下降。

3.2 改进分离系统制备手工分离浓缩血小板的关键控制点

只要建立全程质量控制,保证产品质量,手工分离浓缩血小板产品在当前仍然是临床输血治疗中一个重要的品种。而全程质量控制关键点包括:(1)人员上岗资格确认;(2)关键设备的质量控制:离心机使用前必须由设备科对其转速、温度、时间等性能指标进行确认,并每半年确认一次。(3)材料的质量控制:耗材依据《血站质量管理规范》的要求进行关键物料检测合格后方能投入使用。(4)制备过程的质量控制:用于制备手工分离浓缩血小板的血液于室温保存,需采血后6 h 内在20~24 ℃的全封闭制成。严禁放入2~6 ℃储存[4];离心过程的关键控制点是离心机预先调温度到20~24 ℃,离心过程中温度也控制在20~24 ℃;离心机刹车档次不能设置过高,防止因刹车过快,红细胞与血小板界面比较疏松而红细胞荡起;在转移离心好的血袋时一定要轻拿轻放,尽量缩短移动距离[5];分离手法的质量控制:第一次离心后分离白膜层时,用双手食指及中指尽力推挤压白膜,将剩余血浆、白膜层及靠近白膜层11.5厚的红细胞挤入转移袋中;第二次离心后分离最上层呈淡黄色云雾状浓缩血小板时,要使之缓慢流入50 mL转移袋中,排出空气,操作中控制红细胞混入量。其关键控制点是离心后的血液应尽快分离血小板,放置时间过长白膜中的部分血小板会自动沉入白细胞层,降低血小板获得率;分离血小板时流速不能太快,以防止形成涡流将下层的白细胞、红细胞带入血小板中;分离白膜层时一定要控制容量,使终产品容量在25~30 mL。产品的容量与最终产品血小板的数量在手工制备浓缩血小板的过程中是一对矛盾体,在回收率相对固定的前提下,单位体积中血小板的数量是固定的,若产品容量大,则血小板的计数自然成比例增高;而产品容量小,则血小板的计数自然成比例降低。因此,白膜回浆法制备血小板的最大难点也在于如何有效地控制中间产品的容量以保证最终产品容量和血小板计数符合国标的要求,笔者认为这也是大家应该共同关注的问题。

3.3 改进分离系统制备手工分离浓缩血小板的效果评价

结果显示在全血血小板量总体均数无显著性差异的情况下,利用改进分离系统制备手工分离浓缩血小板其血小板的回收率高于常规分离系统,随机抽检所有具有上岗资格人员,采用经确认的改进分离系统标准操作规程制备的手工分离浓缩血小板,其产品质量符合《全血及成分血质量要求》(GB184692001),说明该制备方法优于常规分离系统且能够保证产品质量。其特点是采用双通路,使分离悬浮红细胞和血小板由两个堵头分别控制,管径长度非常短,为10 cm,无需接袋真正实现"白膜回浆法",减少分离中黏附在管路中白膜的浪费,有效的控制终产品容量,从而提高血小板回收率;白膜袋及血小板袋内无沟槽,以减少血小板在袋壁的附着,提高血小板回收率;五联袋可减少因用无菌接管机连接血袋而造成的成本增加和细菌污染的可能性。

近年来,随着全自动全血血液成分分离机在欧美国家悄然应用,使手工血小板实现了自动化、标准化;如果血小板5 d保存国产袋能够成功投放市场,手工分离浓缩血小板在临床输血中会有更广阔的空间,为节约血液资源打下了坚实的基础。

参考文献

1 中华人民共和国卫生部.中国输血技术操作规程(血站部分)[M].天津:科学技术出版社,1998.34.

2 中华人民共和国国家标准.GB1846T2001献血者健康检查要求[S].北京:中国标准出版社,2001.13.

3 中华人民共和国国家标准. GB184692001全血及成分血质量要求[S].北京:中国标准出版社,2001.89.

第3篇

【关键词】银企互联;资金管理;中国电信;实践

一、电信企业资金管理中的现状和问题

通信行业是一个资金密集型的行业。根据2011年财务年报披露,中国电信2011年经营收入达2450.41亿元,同比增长11.7%,EBITDA为942.66亿元,同比增长6.5%,EBITDA率为40.8%。公司股东应占利润达164.04亿元,同比增长10.5%,每股基本净利润0.2元。财务管理是企业管理的重要组成,而资金管理又是财务管理的关键因素。中国电信作为业务收入规模如此庞大的集团企业,加强并完善资金管理对提高整个中国电信的财务管理水平,提升企业价值具有十分重要的作用。中国电信在2005年提出了由传统基础网络运营商向综合信息服务提供商的战略转型策略。为实现战略转型,中国电信除了在技术革新、运营创新、业务牌照等方面实施转型外,还实施全方位的内部控制来提高运营效率,降低运营成本,实现利润增长。要实现转型,推进组织架构由固网分散经营向全业务集约运营转变成为必然,精细化管理的集约运营模式要求在财务管理方面也实现财务体系、资源配置的优化,加强资金管理就成为财务转型的重要工作。中国电信作为基础电信运营商,在全国各省市县都设有分支机构,跨地经营,分支机构庞大。如广东电信就下属21个市分公司、135个县分公司和1195个营销服务中心。每个市县分公司都有自己独立的财务功能和资金管理人员,在财务管理方面存在结构重叠、人员众多、资源浪费的问题。中国电信在长期的发展中实行的是粗放式管理模式,在财务管理特别是资金管理方面存在着由于资金管理使用分散而导致的资金闲置率高、财务费用多而导致的资金管理成本高、资金有效使用率低而导致的短期贷款多等问题。每个分支机构根据各自需求,开设不同的银行账户,导致资金冗余量大,融资贷款费用高,结算手续费高,导致财务统一管理和控制难,财务管理风险较高。

二、电信企业实施银企互联的主要做法和经验

1.实施财务共享服务,推动财务管理精细化。为推动企业转型,中国电信近年来实施从粗放式管理模式向全业务集约运营的转变,在财务管理方面也实施精细化管理。实施财务共享服务是中国电信在财务转型中的重要一步。2008年底,广东电信作为首家省级成立财务共享服务中心(Finance Shared Services Center,以下简称FSSC)电信公司,围绕集约运营战略,创新财务集中运营模式。目前中国电信下属所有省级公司已陆续基本完成了FSSC的搭建工作。在逐步实施财务共享服务的过程中,中国电信首先是重新定位财务职能,统一财务内部架构,使财务职能转型为服务业务经营。各省级公司将财务职能重新划分管理会计和财务会计两部分,成立财务共享服务中心,将省级公司本部和地市分公司的财务核算和资金支付集中处理。其次是完善财务规章制度,统一会计处理标准,建立保证FSSC规范运作的流程体系。第三是运用信息技术手段,集成财务信息系统,提高FSSC的服务质量和效率。财务信息系统除了包括常规的财务核算系统外,还在资金支付体系关联银企互联系统,大幅提升资金支付效率。

2.通过银企互联,打造安全高效的资金集中结算和稽核平台。随着财务共享服务的实施,中国电信省级公司的资金逐步集中由财务共享服务中心结算。如广东电信全年资金支付量在240万笔左右,月均支付结算量近20万笔,如果仍采用传统的手工操作模式,如不大量增加人员,将无法应对业务增长需求,无法满足外部客户和内部员工付款时限要求,对企业利用社会力量进行市场拓展以及上下游合作伙伴的关系会带来不利影响,更难以开展质量和效率管控,确保企业资金安全和效益。广东电信在建立财务共享服务中心时就提出了利用信息系统手段进行全省资金集中结算的思路,并把依托银企互联、打造安全高效的资金集中结算和稽核平台项作为提升资金结算效率和效益、保障资金安全、打造企业资金结算竞争力的重要项目。该项目从银企直联系统实施的深度和规模上,在通信运营商行业及中国电信省级公司中均属领先水平,得到过同行和中国电信集团公司的高度评价。

3.银企互联实施上具有全覆盖、高度集成、安全性和准确性高的特点。中国电信作为通信运营商在企业信息化的建设方面水平很高,在实施财务共享服务伊始就需要资金管理操作能直接同步到银行进行相关处理,银行提供的电子账单能够同步更新到财务系统,避免在资金管理系统和网上银行进行重复操作。因此资金管理与网上银行系统对接就成为迫切需求。企业需求促使各大银行推出银企互联模式,通过企业的ERP系统与银行网上银行系统的有机融合和对接,整合银企双方的系统资源,成为中国电信实现资金集约管理的有效手段。

广东电信实施的银企互联具有以下特点:首先是全覆盖。银企直联范围涵盖资金结算涉及的所有类型:包括全省的资金调度结算、对外支付集中结算、费用薪酬集中结算发放等。

第4篇

因此,我们探索尝试以合同审计为切入点,搭建一个覆盖“采购方式、价格确定、合同签订、履约付款、合同结算”业务流程的全项目监控、全过程跟踪审计的采购项目内部控制体系,服务于企业以实现利润最大化的目标,显得很有意义。

一、概述

(一)内部控制和采购项目内部控制

内部控制主要是为了避免错误、侦察错误、改正已察觉的错误,在损失风险较高处及需加强控制处,加强控制上的弱点。运用恰当有利于减少疏忽、错误与违纪违法行为,并改善经营活动,以提高工作效率与经济效益。采购项目内部控制必须以企业发展目标为统领,围绕企业风险取向合理设定控制目标,采取相应的控制措施,使之处于有效的监督之下。

(二)内部控制审计和采购项目内部控制审计

内部控制审计就是确认、评价企业内部控制有效性的过程,包括确认和评价企业控制设计和控制运行缺陷和缺陷等级,分析缺陷形成原因,提出改进内部控制建议。采购项目内部控制审计目标旨在评价采购业务流程内部控制是否良好建立及遵循程度,完善采购业务流程风险控制机制,从而提高采购项目内部控制的营运效率和效果。

二、采购项目内部控制原则和主要审计方法

在设计采购项目内部控制体系之初,我们对现有业务流程和合同审计进行梳理,加强弱点控制,最终确定以“业务人员报审―审计人员审核―审计结果反馈”为基本审计流程。以合同审计为切入点,应用“起点介入、过程监督、突出重点”控制原则,集中体现“协同审计”理念,主要对合同采购业务开展程序性审计,在此基础上选择开展过程跟踪和实质性抽查审计,从而达到“由点到线、由线到面、逐级结合、统御全体”的统合作用。在制订采购项目内部控制流程时,认真分析企业采购业务现状与风险导向,理顺采购业务相互间的关系,选择关键控制点时考虑了三个方面因素:一是能够最好地衡量业绩,二是能够反映重要的偏差,三是能够以最小的代价纠正偏差。因此,采购项目内部控制体系以合同审计为关键控制点设置体现了精而准的原则。内部控制基本理念为:

采购项目内部控制实质是不同类别的控制相互配合,以达成目标。采购项目内部控制特征是全面性、经常性、潜化性、关联性,使采购活动符合企业利益及既定规范。内部牵制着重于将审计监督渗透于采购业务运行之中,寓牵制于处理程序之中,其目的在于防止或及早发现错误或舞弊,使错误与舞弊减至最小程度,从而达成运营效果与效率的最大化。采购项目内部控制原则主要体现在三个方面:一是科学合理的可操作性,在各控制关键点或风险区域时段,明确与该控制点相关的操作步骤、各步骤及审计部门或审计岗位所应履行的职责权限;二是利于控制的相互牵制性,纵向关系上,使采购业务下级受上级监督、上级受下级牵制,横向关系上,使采购业务接受审计监督部门检查和制约;三是便于检查的标准性,建立针对各个环节定性和定量相结合、具有客观性和可比性的内部控制标准和审计评价指标体系,一项采购业务完成后,审计监督部门对每个环节检查评价和打分,并分析产生偏差原因,分清责任。

三、采购项目内部控制存在的问题及审计对策

烟草行业全面审计反映,采购项目普遍存在的问题是:采购方式审批程序履行不完整,未建立供应商资质认证制度并严格执行,采购合同制订和执行、过程管理和监督职责、验收和付款方面不合规,项目后评估管理不到位等。全面审计查摆出采购项目问题点数量11个,涉及金额60 485.85万元,其中:

针对采购项目内部控制存在的共性问题、突出问题,审计部门深入分析产生原因,提高内部控制意识,督促完善采购相关管理制度,建立长效内控机制杜绝类似问题再次发生。一是优化采购业务内部控制流程,设置审计关键控制点;二是实现采购基础信息高度共享,将审计内控系统与采购管理系统有效对接,提高审计在内部控制中的作用;三是加强采购预算和价格的审计控制,预算控制重点审计固定计划中采购物资的资金占用量和补充计划中物资采购的及时性,价格控制以“应招尽招、真招实招”的公开招标为主要采购方式,建立性价比审计内控机制;四是建立采购项目定期审计评估机制,对采购成本控制(起伏价)、采购交期控制(采购进度达成率)、品质成本控制(进货品质达成率)进行绩效考核与审计评估。从审计监督内部控制角度,重点解决审计与业务流程脱节问题,推行实施“实时跟踪+联网核查”审计模式,逐步实现内部控制审计的“三个转变”:从单一的事后审计转变为事前、事中、事后审计相结合,从单一的静态审计转变为静态审计与动态审计相结合,从单一的现场审计转变为现场审计与远程审计相结合。

四、以合同审计推进采购项目内控体系建设

(一)采购项目内控体系总体审计业务流程设计

审计业务流程设计与运行,是采购项目内控体系建设的关键环节。我们对企业所有采购业务通过制度化的控制手段和图形化的流程模型来进行再造,达到审计业务流程优化。一是以流程管理为内控体系载体,通过审计流程管理发挥内控体系作用,在流程中设置项目批复、合同管理、送审管理、项目管理等关键控制点,梳理明确审计业务流程使内部控制发挥最大效用。二是以审计流程管理促使采购工作有章可循,从业务流程入手开展审计,在管理控制的采购链条中查找问题,使审计工作很快切入问题根源,从根本上强化采购项目内部控制。三是以合同审计为切入点,对采购项目审计业务流程进行基础性再思考和实质性再设计,从而获得成本、质量、服务和速度等方面的显著改善,通过审计“流程再造”完善采购管理、加强内部控制,通过审计“流程再造”不断优化采购业务链条,及时发现潜在风险和问题,增强采购业务管理和审计内部控制的互动性。四是以所有参与方为审计资源进行整合,把业务部门、审计部门及中介机构流程整合引入内部控制资金监管链条,将审计系统与投资管理系统、两项工作系统有效对接形成闭环式内部控制,提高审计工作效率。总体业务流程为:

(二)审计内控系统与采购管理系统有效对接

烟草行业的投资管理系统、两项工作系统运行已久,形成了一整套成熟的采购管理模式,将审计系统与其有效对接,可以极大提高审计在内部控制中的作用。从投资管理系统和两项工作系统的“项目实施方式”审计介入,对公开招标、邀请招标、竞争性谈判、询价、单一来源等采购方式的确认审查是否合规、合理,坚持以公开招标为主要采购方式,确保“应招尽招、真招实招”;在两项工作系统“发起合同审批”环节切入审计部门审批流程,将审计部门审核结果反馈到两项工作系统中;在投资管理系统和两项工作系统的“签订的合同信息”环节实现审计系统信息共享;对两项工作系统中的工程类项目,嵌入审计部门付款审批流程,将审批结果作为两项工作系统的资金支付申请信息依据;最终实现投资管理系统、两项工作系统、审计系统“付款信息”共享,形成采购项目内部控制闭环式审计管理。

(三)审计在采购项目内控体系中的主要做法

从内部控制的“内部环境、风险评估、控制活动、信息与沟通、内部监督”五大要素可以看出,内部控制是否健全以及能否严格执行,是决定成败的关键,主要是对管理活动予以制约,使经营活动符合企业利益及既定规范和标准。采购是指以合同方式有偿取得工程(含信息化项目)、物资和服务的行为,包括购买、租赁、委托、雇用等,我们将其整合归类为“工程类采购、物资类采购、服务类采购”三大项,以合同审计为切入点的采购项目内部控制体系,主要履行采购项目运行流程的内部控制审计。一是以采购项目合同签订审计为切入点,主要对合同洽谈和主要条款以及送审资料的合法性、合规性、完整性进行审计,包括年度采购计划、项目采购方案、采购招标文件、商务谈判文件、与中标中选供应商签订采购合同以及对方单位资质等相关资料;二是开展采购项目合同履约过程跟踪审计,主要对到货验收、签证、结算付款等情况进行审计。主要做法为:

项目管理式审计 项目管理式审计是由内审人员对所有签订合同进行审计,参与监督合同签订的重要过程,实现合同内控审计日常化。以采购项目合同签订审计为切入点:一是审“该不该签”,对合同项目的可行性审查和效益性审查,检查合同项目是否列入年度采购计划并报批,检查合同项目是否经可行性研究或项目评估,其技术性、经济性是否先进、合理,检查与立项有关的文件资料是否真实、可靠,检查合同标的数量是否适当,能否满足企业生产经营需求,检查合同约定是否充分考虑企业生产经营实际需要。二是审“跟谁签”和“以什么样价格签”,对合同签约主体选择和合同价格选择的合理性、适当性进行审计,首先审查合同签约主体的合法性,其次审查供应商确认和合同价格确定的合规性。三是审“怎么签”,对合同形式、文本格式和合同条款进行审计,首先审查合同形式是否符合法规,其次审查合同文本是否符合规范,重点审查合同条款有无遗漏,主要条款内容是否具体、明确、切实可行,避免因合同条款不完备或过于简单、抽象,给合同履约带来困难而损害本企业合法权益。采购项目合同签订切入审计以来,审计采购项目合同共254项,涉及金额13 660.56万元,审查不合规条款153条,提出审计修改意见138条,采购业务部门采纳审计意见126条,审计意见采纳率91.3%,有效控制和规避了企业经济合同履约风险。

过程跟踪式审计 过程跟踪式审计是有重点、有目的地将合同履约管理纳入日常审计控制,形成关键控制点,实施相应审计程序的审计模式,侧重审查合同履约管理是否规范、有效。开展采购项目合同履约过程跟踪审计:一是审查采购项目管理是否存在内部控制设计缺陷,审查采购管理制度、合同管理制度是否健全,对采购项目内部控制设计的健全性进行测试和评价,促进完善采购项目内部控制体系建设。二是审查采购项目管理是否存在内部控制运行缺陷,对合同执行结果和管理效果审计,主要审查合同内容是否得到严格、全面履行,审查有无合同违约,违约是否按合同及时组织索赔,审查合同管理效果是否满足效率、效益要求。采购项目合同履约跟踪审计以来,审计抽查采购项目共22项,涉及金额8 557.72万元,查摆问题46项,涉及金额3 849.16万元,提出审计管理意见51条,并督促采购业务部门及时整改,审计意见整改率94.5%。通过对采购项目内部控制设计与运行的合同履约审计,为企业降低采购成本而直接产生经济效益达513.2万元。

五、采购项目内部控制审计展望

以合同签订审计为切入点的采购项目内部控制体系,是以合同履约过程跟踪审计为主线、以采购合同关键控制点为基础,内部控制审计在采购业务处理过程中发挥着重要作用。设置关键控制点的目的是为了发现和纠正舞弊,防范风险,而内部控制的重点也是防范风险,避免和减少差错和舞弊、效率低下、违法乱纪行为的发生,关键控制点及其控制措施准确与否决定了企业内部控制的成败。不同业务反映的控制点、关键控制点不同,要求的控制措施也有区别,但相同业务反映的控制点、关键控制点大同小异。现有采购业务问题重重,采购内部控制存在诸多缺陷,以合同审计为切入点而建立起来的采购项目内部控制体系尚处于探讨摸索阶段,采购业务内部控制是一个持续过程,不是一劳永逸的。随着信息技术发展、环境、顾客和竞争的变化,由于受采购业务活动中限定性不利因素影响,在实际应用中也必然会出现一些新问题亟待解决。如:受审计资源限制,合同履约审计覆盖面偏小,审计抽样存在一定缺陷等。笔者认为,加强采购项目风险管理,进一步强化采购业务内部控制势在必行。

(一)改善风险管理强化内部控制

企业风险管理有四个目标(实现战略、高效运作、客观报告、遵守法则)、八个要素(内部环境、目标设定、事件识别、风险评估、风险反应、控制活动、信息沟通、监控活动),并在企业四个层次展开。对于任何企业来说,风险管理都是其经营过程中的核心内容。风险管理是企业管理层及相关人员的一项主要职责,应当通过建立完善的风险管理体系及风险程序来管理企业风险。而内部审计具有独立性、综合性、经常性和及时性等特点,在风险管理方面内部审计具有独特的优势。构建“以风险为导向、以内控为主线、以治理为目标”的采购项目内部控制体系,将风险管理理念贯穿于整个采购业务流程,使内部控制审计的价值作用凸显。通过对企业风险管理体系的健全性、有效性进行监督和评估,对风险管理过程的及时性、科学性进行评估,找出企业风险管理体系的薄弱环节,帮助企业发现并评价重要的风险因素,指出其控制缺陷,并提出改进意见,提供风险管理的有效方法和控制措施,帮助企业改进风险管理与控制体系,规避经营过程中可能出现的风险损失,进而实现企业价值增加。在采购领域,以合同管理审计为主要内容,强调风险导向与审计关口前移,“全程参与”对风险进行识别、分析、评估、应对并进行有效控制,规避风险,不断改善风险管理,持续完善采购项目内部控制。

(二)采取补偿措施强化内部控制

在每一个覆盖“采购方式、价格确定、合同签订、履约付款、合同结算”业务流程的全项目监控、全过程跟踪审计的内部控制项目实施后,应进一步采取补偿性控制措施,适时开展项目后评估工作,主要从三个方面对其进行作业评价:一是基础作业评价,包括供应商选择评价和购货作业评价,关注主要目标、主要风险及注意焦点;二是管理作业评价,包括计划管理评价和风险管理评价,关注企业管理活动、外部关系管理及提供服务;三是控制作业评价,包括资金处理作业评价和分析与调节作业评价,关注生产成本处理、财务报告及管理报告处理;四是建立合同审计信息系统,利用计算机对信息处理的准确快捷,审核流程数据验证、清理和转换,从而有效地利用计算机系统实现高效的审计工作。通过内部控制审计作业评价及信息化数据处理,可以及时发现内部控制体系的缺陷并应用PDCA循环不断加以完善,最终达成企业运营效果与效率的最大化。

(三)完善内部控制实现价值增值

内部审计本身是内部控制的一个重要环节,是企业内部监督的重要组成部分,同时又是内部控制的再控制。可以对企业内部控制情况进行测试评价,指出企业内部控制制度上的缺陷及制度执行过程中存在的偏差。内部审计人员通过查清其产生的原因,分析其可能造成的影响从而找出企业内部控制的薄弱环节,提出改进的意见和建议,督促有关部门整改落实,促进企业健全内部控制,防范和化解经营风险,从而帮助企业预防和减少损失,为企业增加价值。在间接价值方面,内部审计会对企业职能管理部门产生潜在的“免疫系统”功能作用,会促使他们严格管理,落实控制措施,从而预防风险,减少损失。在采购领域,主要通过审查采购项目各项管理制度的建立健全及执行情况,评价其运行是否规范、有效等促进各项管控措施的落实,防范风险,从而实现企业利润最大化。

参考文献

[1]中国内部审计协会.中国内部审计准则[S].

第5篇

摘 要 轨道交通项目建设机构在建设过程中对整个项目的全过程的合同管理,大致可分为招标策划、资格预审、招标与定标、合同执行、合同总结与后评估、合同管理培训等六大阶段。介绍了每个阶段合同管理的重要性,并提炼出全过程管理中各阶段的关键控制点。

关键词 轨道交通,全过程,合同管理

1 问题的提出

近年来,大型轨道交通项目在我国许多城市蓬勃开展,政府作为(主)投资方,对项目建设管理的要求正在全方位化。对于项目建设管理,目前推行“四项制度”,即:项目法人责任制度,招标投标制度,工程监理制度和合同管理制度。合同管理制度在四项制度中虽位居最后,但它作为工程建设管理的重要分支,与工程建设、项目管理等交织在一起,在建设管理机构中所占的权重越来越大。为此,各地均成立了专门的合同管理部门,合同管理制度化、科学化、专业化已被提上议事日程。

轨道交通项目建设中,合同管理应是贯穿项目始终的全过程管理,大致可分为招标策划、资格预审、招标与定标、合同执行、合同总结与后评估、合同管理培训等六个阶段。各阶段相辅相成,互为衔接与补充,其重要性不相上下。各阶段在合同全过程管理中所占的大致比重如果1所示。

第6篇

关键词:项目 信息化管理系统 需求分析 框架

某企业年均承担科研项目70余项,年科研投资均超过10亿元,加之科研项目本身具有研究周期长、投资成本高、涉及范围广等特点,给项目管理工作带来很大的难度,迫切需要企业建立一套完善、高效的科研项目信息化管理系统。

一、企业科研项目管理过程中存在的问题

(一)平台孤立,难以对科研项目进行全方位、全流程管理

企业虽在合同管理、预算管理及财务管理等方面应用了部分软件,但这些平台的信息化是孤立的、非集成的,系统扩展性较差,无法为企业科研管理决策提供全面、集成的信息支持,也难以对科研项目进行全方位、全流程的管理。

(二)模块不完善,缺乏合同立项、进度控制等关键节点

企业采用的合同管理系统为文本型系统,在合同立项时无法对合同经费来源进行有效管控,导致合同签订后出现经费不足以保证合同执行的情况;同时无法实现合同进度管理,存在未按进度付款、合同逾期等问题。

(三)信息不对称,管理漏洞难以避免

与合同有关的信息存储于企业合同管理系统中,与项目预算有关的信息存储于企业全面预算管理系统中,与项目投资支出有关的信息存储于企业财务核算系统中,其他信息如项目基本信息、进展情况、成果信息等更是游离在系统之外,由于系统之间及系统内外的数据无法共享,各部门之间的信息不对称,存在成本控制信息偏差、项目进度难以掌控等管理漏洞。

(四)事后管控,成本控制效果不理想

企业为加强科研项目管理确立了科研台账管理模式,通过人工登记台账的方式进行投资控制,分别由科研管理部门登记项目总经费及预算批复台账,合同部门登记合同台账,财务部门登记项目支出账,业务部门登记项目流水账。这种模式在加强项目经费管理方面发挥了积极作用,但由于存在主要依赖于人工,且侧重于事后管控,数据误差等问题时有发生,成本控制效果不甚理想。

(五)耗时耗力,管理效率低下

为掌握科研项目的关键信息,企业设计了项目立项情况统计表、合同签订与执行情况统计表、项目经费预算与批复情况统计表、项目经费执行情况统计表及项目进度报表等多种报表,人工统计相关信息,耗费大量的人力物力,信息的准确度和及时性难以保证,管理效率不高。

二、企业科研项目信息化管理需求

(一)全方位的项目管理平台

衔接企业全面预算、财务核算系统、合同管理系统和人力资源管理系统,将项目立项到合同签订、资金预算、报销及付款、项目进度、项目成果、项目档案及统计报表,全部纳入到系统中进行统一管理,提供一个能蚵足实际业务需求的集成性管理平台,实现科研项目的全流程、全方位管理。

(二)完善的合同管理体系

将合同立项、合同经费控制、合同基本信息、合同资金申请、付款、验收及统计查询等信息全部纳入到项目管理系统中,弥补企业合同管理系统存在的漏洞,对项目合同进行全周期管理,提供一个完善的合同管理体系。

(三)高效率的协同办公系统

以单个项目(课题)为单位建立项目基础档案,包含从项目立项到执行结束的全部信息,各部门根据权限可及时更新和查询,实现数据共享,减少因信息不对称造成的管理漏洞。同时,通过对接全面预算系统,可以实现月度预算数据自动传输;对接财务核算系统,可以实现报销单据自动生成凭证,财务系统自动取数,减少财务核算工作量,确保统计数据的准确性,提供一个高效率的协同办公系统。

(四)严格的成本控制

投资成本控制是项目管理的重中之重,通过项目管理系统,预置严格的成本费用控制策略,根据项目进展情况,在满足一定的条件,如材料验收入库、软件交接、完成培训及中期验收等,并上传相应的证明材料后,才允许申请和使用资金。完全由系统进行预算执行控制,将项目经费支出全部纳入到预算盘子内,杜绝预算外及超预算费用开支,从严控制项目投资。

(五)实时、全面提供项目信息,为管理者科学决策提供数据支撑

企业管理者不仅需要依靠丰富的经验来做出判断,也需要及时准确的项目信息为决策提供支持。通过项目管理系统,管理者可以实时、全面、准确地获取投资、合同、进度、资金及成果等统计信息,以便于及时了解项目进展,分析并预测项目可能发生的变化从而采取应急措施。信息系统虽然不能像人脑一样具有极强的逻辑思维和模糊判断能力,但其精准、快速、全面的统计信息却能够为每个决策者提供良好的依据,是做出科学决策的基础。

三、科研项目管理系统框架分析

科研项目管理系统操作界面可以考虑搭建在企业ERP系统、全面预算管理系统或财务系统下,以方便数据共享,避免重复性的信息录入等工作。根据企业实际,笔者认为系统应主要包括9大模块:项目立项、项目基本信息、合同管理、资金预算、报销及付款管理、项目进度、成果管理、文件管理及统计报表。

(一)项目立项

该模块主要内容包括填写科研项目立项申请书及可行性研究报告,按照企业内部管理流程提交到投资管理或科研管理部门,由其进行审批、回退等操作。关键控制点是系统应能够对项目预期研究成果或创新点自动进行重复性查询,避免重复立项等现象的出现,节约投资成本。

第7篇

关键词:通信工程;合同管理;合同签订;风险;变更

Abstract: with the break-up of China telecom industry restructuring, increasing communication engineering project, the communication manufacturing industry in order to effectively use and coordination of all resources, reduce operating costs, improve operational efficiency, has been introduced into project management system. Contract to determine the price (cost) of the project, construction period and quality target, the provisions of this contract has two sides. Therefore contract management is the core of project management. This article first analyzes the communication engineering project contract management the main problems existing in, and then from the five aspects of the main points of the communication engineering project contract management is discussed in detail, which focus on contract risk management are discussed in this paper.

Key words: communication engineering; Contract management; Contract is signed; Risk; change

中图分类号:F284文献标识码:A文章编号:2095-2104(2013)

通信工程项目合同管理中存在的主要问题

(一)法律意识淡薄,合同签订不规范

通信建设工程耗资巨大、涉及面广、个性差异大和履约时间长。因此,客观上要求合同条款细致严密,尽可能做到面面俱到。在实际工作中,甲、乙双方由于缺乏施工合同管理的经验,订立的合同约束条款不全、内容不明、职责不清等现象经常发生。

有些通信项目在签订合同时为了回避业主义务,不采用标准的合同文本,而采用一些自制的、不规范的文本进行签约。通过自制的、笼统的、含糊的文本条件,避重就轻,转嫁工程风险。有的甚至仍然采用口头委托和政府命令的方式下达任务,待工程完工后,再补签合同,这样的合同根本起不到任何约束作用。如在工程招投标中,有的当事人为了获取不正当利益,在签订中标合同前后,往往就同一工程项目再签订一份或者多份与中标合同价款等实质性内容不一致的合同,这就是我们通常所说的“阴阳合同”,待工程实施起来,一旦涉及到经济利益,将容易导致工程纠纷的发生。

(二)忽视合同的严肃性,违背等价有偿的原则

自觉执行合同条款,全面履行合同义务,是合同当事人一切行为的最高准则。签订合同的甲、乙双方,经济法律地位是平等的,没有主从关系。在实际工作中,承发包双方忽视合同的严肃性,违背合同的等价有偿原则,以各自的经济利益为中心,随意违背合同条款。甲、乙双方的这些违约行为,最终导致工程经济纠纷的发生。

合同文件存在合同双方权利、义务不对等现象。从目前实施的通信建设施工合同文本看,施工合同中绝大多数条款是由发包方制定的,其中大多强调了承包方的义务,对业主的制约条款偏少,特别是对业主违约、赔偿等方面的约定不具体,也缺少行之有效的处罚办法。这不利于施工合同的公平、公正履行,成为施工合同执行过程中发生争议较多的一个原因。同时,由于目前建筑市场的激烈竞争和不规范管理,大量的施工队伍与建设规模严重失衡,致使业主在建设工程承包中占据主导地位,提出一些苛刻和不平等的条件,将自身的风险转移到承包商身上。由于建筑市场处于买方市场,承包商为了获得工程,只好接受。个别承包商在实施这样的工程合同时,为了使自己的利益不受损失,就会采取偷工减料或非法分包甚至非法转包等手段,给工程建设带来隐患。

(三)缺乏健全的合同管理机构

一些通信建设项目不重视合同管理体系的建设。合同归口管理、分级管理和授权管理机制不健全,谁都可以签合同,合同管理程序不明确,或有制度不执行,该履行的手续不履行,缺少必要的审查和评估步骤,缺乏对合同管理的有效监督和控制。

政府有关部门要对通信建设工程施工合同实施监督、检查等管理。通信施工企业、建设单位更要对施工合同进行管理。有些地方的合同管理机构不健全,对合同的审查、监督和检查不得力。建设单位没有建设工程施工合同管理的力量,遇有建设工程,便委托给监理公司,而目前监理公司的机构设置不规范,合同管理力量薄弱,往往很难胜任建设单位的委托;施工单位,特别是中、小型施工单位,重视公关和预算管理,轻视施工合同管理,甚至没有专门机构从事施工合同管理工作。

通信工程项目合同管理的要点

(一)加强合同风险的识别和防范

合同风险是合同中的不确定因素,它是工程风险、建设单位资信风险、外界环境风险的集中反映和体现。合同风险是客观存在的,是由工程的复杂性决定的,是合同双方必须共同承担的。对于工程中的风险,应从识别和防范两个方面对其进行控制。

1、风险的识别方法

合同风险的识别要求列出所有与合同相关的关键控制点、风险来源、产生条件。风险识别的方法一般包括:

(1)问询法

问询法包括调查问卷法、面谈法、专题讨论法、德尔菲法等。实际工作中多采取调查问卷法。在审计实践中,合同审计调查问卷可以从以下几个方面展开,一是合同管理机构设置及人员配备情况,二是岗位职责制订及履行情况,三是合同管理流程情况,四是合同管理基础工作,如相关合同管理制度、合同管理台账、合同档案管理是否建立健全等。

(2)流程图法

流程图法主要是将合同从立项签订、招投标、委托授权、市场准入、合同履行、终结及售后服务全过程,以流程图的形式绘制出来,从而确定合同管理的重要环节,识别合同风险,进而进行风险分析,提出补救措施。这种方法比较简洁和直观,易于发现关键控制点的风险因素。

(3)测试表法

测试表法主要是将合同各关键控制环节以测试表的形式进行测试,以查找合同管理的风险点和控制缺陷,分析其潜在的影响和重要程度,提出规避和防范风险的措施。测试表大体上可以设计以下几种:一是市场准人控制测试表,主要测试合同签订双方队伍资质、市场准人情况、外部队伍考核情况和转包、分包情况。

二是招投标和授权批准控制测试表,主要测试经济业务是否按规定进行投标、投标过程是否规范、招投标收入是否纳入统一财务管理、合同签订程序是否到位、甲方人是否持有委托授权书。

风险的防范

通信施工企业在合同正式签订前应进行严格的审查把关。其要点是:

(1)施工合同是否合法,建设单位的审批手续是否完备健全,合同是否需要公证和批准;

(2)合同是否完整无误,包括合同文件的完备和合同条款的完备;

(3)合同是否采取了示范文本,与其对照有无差异;

(4)合同双方责任和权益是否失衡,确定如何制约;

(5)合同实施会带来什么后果,完不成的法律责任是什么以及如何补救;

(6)双方合同的理解是否一致,发现歧义及时沟通。

3、风险识别与防范的案例分析

某干线传输网工程,在6个省内进行传输设备的安装测试工作。建设单位(甲方)通过招投标,确定了两家设备厂商:A厂商提供40×10Gb/SDWDM设备,B厂商提供10Gb/SSDH设备。工程由两家施工单位C、D分别在三个省内进行设备的安装和测试工作,甲方指定施工单位C作为工程的施工、测试总协调单位。下面从施工单位的角度进行合同风险的分析:

本项目的风险利用流程法、测试表法、现场观察法和合同分析法等方法进行分析,主要来自于以下方面:

(1)工程风险:

①技术风险:本项目所安装的主要设备是40×10Gb/SDWDM设备和10Gb/SSDH设备,本设备是高新产品,对这种设备的调测缺乏经验,可能会造成进度拖后,成本增加,质量不稳定。

②管理风险:可能有管理制度不完善,贯彻执行力度不够,易出现质量安全事故。C施工单位负责整个工程的协调工作,除负责自己段内工作外,还要实时掌握D单位的进度,并且要编制全程测试计划,指挥D单位进行系统测试工作。若管理不完善,可能造成工期的延误。

③资源风险:10Gb/s传输设备测试仪表数量有限,存在不能按时提供的风险;本项目工作量大、工期长,造成人员长期出差,家庭原因造成人员离开;与厂家督导观念差异,无法合作。

④质量风险:材料质量不好,工具、设备存在质量问题。

⑤环境风险:施工地点有正在运行的设备,在通信运行安全方面存在风险;粉尘对设备的危害。

(2)建设单位资信风险:建设单位建设资金不到位,融资渠道不畅。

(3)外界环境风险:国家投资政策改变,银行利率调整等。

(二)重视合同变更管理

通信项目合同变更是指合同成立以后、履行完毕以前由双方当事人依法对原合同的内容所进行的修改。在施工过程中,由于变更数量多,同时变更往往牵涉到索赔,因此必须加强变更管理才能减少对方索赔的机会。

(三)规范合同签订的内容

签订通信工程合同时,最重要的是根据各工程的特点,选择恰当的发包方式和价款调整条件(指工程设计变更或工程签证导致工程增减的结算条件和结算方法),因为不同的发包方式和价款调整条件,直接关系工程造价的控制效果。现阶段我国针对不同的合同关系已经制定了合同范本,其中合同的通用条款适用于所对应的工程,不仅提高了合同制定的效率,而且提高了合同的规范性、全面性、公平性。

(四)增强全员管理意识

在通信项目建设施工过程中,应该由专业人员专门从事合同管理。由于现阶段合同管理意识欠缺,必须加强有关人员的培训,开展法律法规教育,明确法律责任,树立依法签约、依法履约的思想,把合同管理作为一项重要的任务。

(五)做好合同履行评价工作

在合同终止之后,合同管理人员会做好建筑工程项目合同资料的手机、保存、整理、分类、登记、编号、装订、归档备案工作,实现工程合同档案管理程序化和规范化。只有对合同的履行情况与具体工程实施计划进行比较,才能进行总结归纳建设过程中的经验教训,为以后的合同管理工作打下基础。

结语

综上,随着市场经济的不断深化,合同将发挥着越来越重要的作用。做好合同管理工作可以的到良好的社会效益和经济效益。在通信工程中,无论是施工企业还是建设单位,做好合同管理对减少造价,缩短工期,获得利益的最大化都有举足轻重的作用。

参考文献

[1]徐晓燕.项目施工过程中的合同管理[J].宁夏机械,2009.2.

第8篇

关键词:工程;审计;控制

中图分类号:F239.45 文献识别码:A 文章编号:1001-828X(2015)024-000-01

一、质量控制目标

1.管理的理念或策略

通过标准化跟踪审计流程,创新工作方法,引入外部力量等作法,构筑公司特色的全方位工程跟踪审计质量控制体系。

2.专业管理的范围和目标

对重点工程项目进行全过程跟踪审计,按照管理规定,加强对工程项目内部监督和风险控制,规范项目支出,提高工程效益,服务公司发展。建立涉及工程项目立项、招投标、物资管理、合同管理、结算审核、财务管理、内部控制等各方面,全过程跟踪审计质量管理体系。对工程项目的合规性、真实性和效益性进行审计,对工程项目投资和管理制度执行情况、内部控制和投资风险情况进行检查和评价,提出建议,促进和加强工程项目管理,达到“规范管理、控制造价、提高效益、服务发展”的审计目标。

3.专业管理的指标体系及目标值

一是基建工程竣工决算审计完成率100%,工程审计覆盖率100%,对所有工程项目进行全面审计;二是审计复审差异率正负3%以内。通过对外部中介机构的审计质量进行检查,复审差异率正负3%以内,如果超过该范围,进行相关考核。

二、专业管理的主要做法

1.标准化跟踪审计流程

为了促使内部审计机构和人员按照统一的内部审计作业标准开展跟踪审计工作,保证审计质量,提高审计人员的业务素质和审计效率,防范审计风险,经过多年的理论研究和实践总结,完成了企业内部审计项目作业标准化的建设,工程审计项目按照标准化流程操作,将跟踪审计质量统一到同一个高度上来。

2.提前跟踪审计端口

根据工程项目特点,根据多年积累的工程审计经验及成果,认真分析了工程管理中存在的风险点,联合业务部门制定了《基建项目成本费用开支标准》(,规范基建项目成本费用的开支原则、范围、标准及程序。一是细化管理要求,设定管理红线。进一步明确了各类成本费用的开支内容、标准,细化没有明确规定的费用标准,统一管理要求;结合实际,对部分费用支出设立禁止性规定,旨在引起重视,防范出现违规行为;二是净化支出内容,杜绝无效支出。对所有支出内容进行梳理,并逐条研究,取消与生产成本可能存在重复的支出,取消在实际操作过程中容易出现争议或后续资产管理中可能存在问题的相关费用,从源头杜绝无效支出。三是规范支付程序,降低管理风险。基建项目费用支出名目多,且每一项费用的支出内容及支出依据各不相同。为统一管理程序,对各类费用的支出程序、支出依据进行明确规定,避免同类费用支出标准不一的现象。

3.创新审计方法,提高跟踪审计工作效率

开展了工程项目内部控制评价研究,积极运用。在参照COSO整合框架、财政部内部控制基本规范等基础上,建成了内部控制评价体系。工程管理作为评价体系的重要一项,对工程管理的内部控制进行了研究。评价体系包括评价标准和评价方法两方面内容。评价标准以剖析工程管理业务模块的环节、流程乃至关键控制点为主线,得出关键控制点的控制内容作为评价标准的基础。评价方法则以测试内容(即关键控制点的控制内容)为目标,针对测试对象(即关键控制点的载体)的不同类型,运用观察、询问、审查、重做等不同的测试方法进行内部控制测试,并对测试结果进行定性和定量打分,形成对关键控制点、环节、模块乃至系统的整体内控评价。

4.采用分层报告,促进跟踪审计成果运用

在报告方式改进方面,尝试采用分层报告的形式,扩充审计成果利用范围。即向被审计单位报告具体项目的完整审计报告;向职能管理部门发送报告某一领域的审计分报告通知相应的主管部门予以应用,强化考核,促进审计成果在“业务管理;就重要风险以审计专题报告的形式上报公司审计委员会和公司领导,增强了报告的时效性,及时汇报,提请公司管理层注意,督促整改。向审计委员会报告工程管理存在问题汇总报告。

另外,要求被审单位对照检查,举一反三,认真整改。在公司召开的经济活动分析会、基建例会等工作会议上,就工程管理的存在问题进行报告,促进各职能部门和相关单位加强管理与考核。

5.规范管理,利用好中介机构专业能力

中介机构作为工程审计的重要一环,利用好外部中介机构的专业优势为公司服务,提高审计成效,具有重要意义。

在中介机构选择上实行竞争性谈判。本着“公平、公开、公正”原则,委托招标公司对工程项目审计所需的造价咨询公司和会计师事务所进行竞争性谈判,每两年进行一次,选聘优秀中介机构参与公司工程审计。

在中介机构资质上,要求高标准。要求所有参加工程审计的造价咨询公司必须具备甲级基建项目造价审核资质,会计师事务所必须具有相应的大型工程项目经验,在同行业具有一定的影响力等。

第9篇

供电公司经济平安风险管理实施方案(附管理控制模板)

按照省公司皖电审353号指导意见和市公司经济平安风险管理实施方案,进一步深化“经济平安工程”建设,实施风险常态化管理,结合公司实际,制定本实施方案。

一、工作目标

以经济活动风险管理控制模板为载体,以经济平安内部监督的联动工作为推动,进一步深化和细化经济平安风险管理工作,强化业务部门树立风险意识,在继续关注关键环节上的制度与机制的建立、制度的执行与机制的运作这两个方面风险的同时,逐步扩大纳入风险评估的要素,关注企业外部因素和内部管理,建立不相容岗位分离的监督制约机制。围绕公司各项业务环节的管理目标,通过梳理业务流程、关键控制点分析开展风险识别、风险评估,制定风险应对措施加以预防和控制,保证公司经济安全。

二、组织领导及责任分工

(一)成立风险管理委员会

组长:张小东

副组长:邓子瑞宋亚

成员:李凤春梅杰唐亚非刘荣海

张军吴军余红姚小平

崔玉民卢山代建国

风险管理委员会下设办公室,挂靠监察审计部。

主任:张军

成员:李海燕赵江河姬建富刘京王伟冯艳

(二)职责分工

经济平安风险管理工作与公司其他管理工作紧密结合,以经济活动风险管理控制模板为载体,全面落实风险管理“三道防线”。

第一道防线:各有关职能部门和业务单位,重点包括:财务部、营销部、生产部、物资公司和阳光公司。具体(分工见附件2)工作职责:

(1)负责制定本单位(部门)具体风险管理实施计划

(2)负责梳理主管的业务流程

(3)负责分析关键点

(4)负责评估风险

(5)负责制定风险控制措施

(6)负责执行控制活动

(7)负责对风险控制进行过程记录

(8)负责向公司监察审计部报送经济平安风险管理明细台帐、季度报表和评估报告。

第二道防线:风险管理委员会,具体工作职责:

(1)审议风险管理策略和重大风险管理解决方案

(2)审议重大决策、重大风险、重大事件和重要业务流程的判断标准或判断机制,以及重大决策的风险评估报告

(3)审议监察审计部或风险管理办公室提交的风险管理监督评价综合报告

(4)审议风险管理组织机构设置及其职责方案

(5)办理公司有关全面风险管理的其他事项

第三道防线:监察审计部或风险管理办公室,定期对各业务部门风险管理工作实施情况和风险管理措施的有效性进行协调和监督,并结合审计项目对公司风险管理进行评估,提出改进建议。具体工作职责:

(1)负责制定总体计划和实施细则

(2)负责部署各阶段具体工作任务

(3)负责指导和协调、督促和检查各责任单位工作

(4)负责信息沟通和宣传培训工作

三、经济平安风险管理工作措施与计划安排

(一)制定实施计划与学习宣传(8月份)

1.制定计划和实施方案。根据省、市公司风险管理指导意见、制订本公司的经济平安风险管理工作计划,明确目标任务、职责与分工、方法与步骤,制定本单位的实施办法,并积极实施。

2.学习宣传与培训。公司上下深入学习宣传《指导意见》,解读文件精神。公司组织对风险管理工作进行研讨,开展经济平安风险管理相关知识学习培训,进一步树立全员风险管理意识。

(二)各单位实施风险评估步骤和方法(8-9月份)

1.梳理业务流程

(1)确定业务管理的各项目标,详细说明该项控制要达到的目标

(2)梳理是否有健全的内部控制制度

(3)梳理是否有清晰的管理流程

(4)梳理是否有明确的管理标准

(5)梳理是否有对应的管理责任人

2.分析关键控制点

(1)找出关键控制点或关键控制环节

(2)分析每个关键控制点可能存在的风险点

(3)收集风险管理初始信息等基础资料,如:制度办法、财务报表、合同、工程项目等资料。

3.对风险点进行评估(采取定量法、定性法、定量和定性相结合3种方法)

(1)定量法:按照lec法(见附件3)或内控评价体系进行定量评估。a评估风险发生的可能性,b评估风险发生的频率(次数),c评估风险发生的危害程度。

(2)定性法:可采用问卷调查、集体讨论、专家咨询、行 业比较、政策分析等。

(3)根据评估结果得出相应的风险提示,风险级别程度为(高风险、一般风险、有风险、暂无风险)

4.制定风险管理控制措施和责任到人

详细描述实际采用的风险管理控制措施,详细阐述控制部门或控制人实施控制的过程和完成时间、频率等。

(1)确定采取的风险管理策略:是控制风险、承担风险、需要上级协调解决的风险、其他等。

(2)将风险控制的责任分解到具体的责任人。

(3)责任人按照控制措施负责对相关的风险进行控制,负责风险防范和控制。

(4)形成风险管理模板,主要包括管理目标、业务流程、关键控制点、风险评估结果、控制措施、风险管理记录台帐。

(三)经济平安风险管理的监督与检查(10月份)

监察审计部定期进行经济平安风险管理专题研究和分析,审核确认各单位自查自评结论,向风险管理委员会报告公司各单位经济平安风险管理工作实施情况,对存在的问题以管理建议书的形式进行反馈,对整改情况进行监督检查。

四、经济平安风险管理有关要求

(一)高度重视。各职能部门都要把风险管理作为重要工作,树立“抓经营业务就要抓经济平安”的意识,按照职责分工抓好风险管理,切实提高风险防范能力,实现风险的在控与可控。

(二)积极运用公司内部控制评价体系。各单位开展风险管理自评应积极应用省公司内部控制评价体系,将其作为开展风险管理自评的重要手段,分析潜在的风险。

(三)建立台帐。各单位应对风险管理信息实行动态管理建立明细台帐(附件4),定期或不定期实施风险辨识、分析、评价,以便对新的风险和原有风险的变化重新评估,并以半年为一周期向监察审计部报送。

(四)定期报告。各单位对经济平安风险管理的实施情况,对存在的风险,要要及时从外部、内部影响因素进行分析、总结。各单位应按以半年为一周期向监察审计部报送一次《经济平安风险管理实施情况一览表》(附件5)及风险管理总结报告,实现风险的日常管理。

附件:

1.供电公司经济平安风险管理控制模板

2.经济平安风险管理评估工作任务分解表

3.经济平安风险管理识别与评估方法表

4.供电公司风险管理明细台帐

5.经济平安风险管理实施情况一览表(半年报)

附件1:

供电公司

经济平安风险管理控制模板

一、财务部

1、货币资金管理

关键控制点:岗位设置人员分工、资金收入、资金保管、资金支付

关键控制点风险识别主要内容:

(1)公司内部与货币资金业务相关的部门是否选派合格人员从事货币资金的相关业务,是否建立了岗位责任制度并明确岗位职责;

(2)不相容岗位应相互是否分离(重点是钱账分离、审核支付记帐分离、银行帐户印鉴管理等)、制约和监督;

(3)供电所核算员的任免、调动是否事先征得县公司财务部门同意,并办理交接手续。

(4)公司内部与货币资金业务相关的部门是否制定严格的发票收据管理制度并加强对发票、收据的购买、印制、领用、保管、缴销、作废的管理;

(5)是否设立专人管理并登记发票、收据台帐;

(6)供电所是否以核算员为管理发票的第一责任人管理各类发票;

(7)县公司电费收入及其他业务收入是否及时全额入账;

(8)县公司营业大厅收取电费的库存现金是否当日存入银行电费帐户;

(9)县公司营业大厅编制的银行缴款单明细是否及时与财务部出纳编制的电费帐户银行存款日记帐相核对。

(10)县公司及供电所库存现金是否设定最高限额,超过限额是否及时存入银行;

(11)财务部出纳人员和供电所核算员是否每日清点库存现金并与库存现金日记账余额相核对;

(12)财务部是否组织专人定期或不定期对公司本部和供电所库存现金进行清查并填写库存现金盘点表及清查记录;

(13)公司本部各生产单位自有资金是否统一纳入公司财务管理,各供电所自有资金是否统一纳入阳光公司财务管理并在公司财务部门和阳光公司财务部分别设置“明细帐”、“备查簿”;

(14)是否制定制度明确各种票据的购买、保管、领用、背书转让、注销等环节的职责权限和程序;

(15)财务专用章是否由专人保管,个人名章是否由本人或其授权人员保管;供电所帐户预留银行印鉴章至少两枚,核算员是否只保管其中一枚印鉴章。

(16)是否制定了库存现金支付的相关制度,库存现金支付范围是否符合规定;

(17)纳人员在付款和结算办理完毕后,是否在凭证上加盖私章。

(18)是否制定了严格的支付审批程序并严格执行,是否根据不同岗位职务设立不同级别的审批权限;

(19)大额资金的支付及对外投资等是否经预算管理委员会或董事会审议,现金支付范围是否符合中国人民银行《现金管理条例》规定。

2、固定资产管理

关键控制点:计价与折旧、使用及维护、资产处置

关键控制点风险识别主要内容:

(1)是否严格按照《国家电网公司固定资产目录》所列固定资产入账,每类固定资产账户应附有单独的卡片或表单,资产使用或保管人是否同时担任资产的记账工作。

(2)是否按公司规定计提折旧,折旧的计提范围、计提方法是否符合省公司固定资产管理办法。

(3)资产价值管理部门、资产实物管理部门与资产使用保管部门之间管理权责是否划分清晰。资产增减变动是否履行必要的审批手续并及时通知财务部门变更相应卡片。

(4)维修和保养费用是否全部进入当期、或者分期摊入各期的成本费用,是否资本化。

(5)是否制定固定资产定期盘点的办法并定期盘点。盘点结果是否进行认真分析,经过规定的批准程序后进行相应处理。

(6)是否建立固定资产保险管理工作制度、机构健全,各责任部门是否按照省公司有关规定对理赔进行处理。

(7)资产处置(包括转让、盘亏、毁损、报废、无偿调拨等)是否按规定权限、程序履行申请、审批、处理。资产处置是否及时准确进行帐务处理。处置残值是否及时准确入账。

3、成本费用管理

关键控制点:预算、控制、核算、分析和考核

关键控制点风险识别主要内容:

(1)是否由各职能部门负责编制本部门归口管理的成本费用年度预算或提出公司年度财务预算的建议。

(2)财务部是否对各部门上报的预算数据及建议进行初审、汇总和平衡后,并在此基础上提出公司全年的预算草案。

(3)是否由预算管理委员会召开预算会议,对预算草案进行审查并下达年度成本计划。

(4)成本责任中心是否将成本指标分解到各职能部室和生产经营单位。

(5)各责任中心是否严格按照下达的成本费用计划对归口于本部门的费用负责安排支出,并按时与财务部核对使用及节余情况。

(6)各部门的费用发票是否按审批权限由有关领导进行审批签字,再到财务部门报销。

(7)费用支付和记账是否职责分离,财务部门是否设专人对费用报销的原始票据进行审核和复核,确保原始票据真实、合法、有效,报销费用及时准确入账。

(8)是否严格按成本开支范围正确核算,有无弄虚作假,乱挤虚列成本费用或人为调节成本现象,成本费用的归集与分配标准是否合理准确。

(9)各责任中心是否负责对各自控制的指标完成情况进行分析,财务部门是否负责对公司成本的分析,是否建立成本分析报告制度。

(10)是否建立成本考核制度,成本费用实绩是否纳入公司经济责任制考核。

4、农维费管理

关键控制点:农维费核算、预算管理、支出管理

关键控制点风险识别主要内容:

(1)农维费是否在远光系统中单独设立账套核算;

(2)农维费是否编制年度财务收支预算,并经预委员会审批。年度中有变更是否履行必要的审批手续;

(3)农维费及农维费差额是否在开具增值税发票时应予以扣除,农维费及农维费差额是否开具普通发票;

(4)农维费的计提和分割是否由营销部门统一计算;

(5)农维费是否按规定的标准计提,账务处理正确;

(6)农维费支出是否规范。

5、重大决策事项管理

关键控制点:筹资、投资、担保。

关键控制点风险识别主要内容:

(1)发生长短期借款是否在年初应编制融资预,并经公司预委员会审批通过,

(2)长短期贷款是否根据年度预算编制月度计划,同时经董事会审批后报省公司审批,经省公司审批后方可借款。

(3)对外投资是否纳入公司预算控制,并经董事会(董事会)审议通过

(4)项目投资与股权投资是否编制效益评价报告并对投资效益进行评价

(5)对外提供担保是否提供担保相关资料及风险评估结果,报董事会批准后报省公司审批。

(6)是否建立担保台账、建立跟踪和监控制度

二、营销部

1、用户申请与电价核定

关键控制点:电价审批、电价执行、用户信息分类、申请手续、用电合同、变更用电

关键控制点风险识别主要内容:

(1)分类电价是否物价部门规定,具体用户的电价类别是否根据核定相关信息确定并由双方签订的供用电合同。

(2)单位或个人需新装用电或增加用电容量、变更用电时,是否按照供电营业规则规定,事先到供电企业用电营业场所提出申请,办理手续;

(3)用户申请新装或增加用电时,是否向供电企业提供用电工程项目批准的文件及有关的用电资料,包括用电地点、电力用途、用电性质、用电设备清单等,并依照供电企业规定的格式如实填写用电申请书及办理所需手续;

(4)营业机构受理用户申请,组织相关人员完成现场勘察,是否就供电电源点、电压等级、供电方式、计量装置的配置提出书面意见,和用户协商后,提出供电方案,由营销部组织相关部门对供电方案进行会审;

(7)用户确认后,是否委托具有资质的施工单位进行施工;

(8)竣工验收合格后,与客户签订供用电合同,明确计量方式、用电性质、电价类别及计算方式等;

(9)用户需变更用电(减容、暂停、暂换、迁址、移表、暂拆、更名或过户、分户、并户、销户、改压、改类)时,是否事先提出申请,并携带有关证明文件,到供电企业用电营业场所办理手续,变更供用电合同,确定新的电价类别;

(10)每年定期开展用电检查和营业普查,是否到用户处核对客户用电设备台帐、合同执行情况、电价执行情况、安全用电情况等。

2、用户工程与业扩工程

关键控制点:工程施工、施工质量、工程验收、表计管理、客户档案

关键控制点风险识别主要内容:

(1)是否制定用户工程与业扩工程的内部控制制度;

(2)是否委托具有资质的设计单位进行工程设计;

(3)是否由用户委托具有施工资格单位进行工程施工;

(4)是否组织对施工图纸进行审查;

(5)施工过程中,公司组织施工质量检查:

(6)隐蔽工程、电源点安全可靠性、双电源客户的闭锁装置,是否按照供电方案要求施工,施工质量如何;

(7)工程竣工后,是否组织相关部门对工程进行竣工验收;

(8)用户工程和业扩工程完工验收合格后,是否由计量管理中心配置表计及客户中心或计量管理中心装表;

(9)电费管理中心在接到计量管理中心的装拆单和客户服务中心的业务单及供电合同后是否进行电费建卡或变更工作以及计算机系统的电费建卡;

(10)业务单、装拆表单以及合同等相关客户资料是否进行审核归档

3、抄表及表计校验

关键控制点:抄表周期、抄表方式、信息反馈、电费复核、表计校验管理

关键控制点风险识别主要内容:

(1)是否制定抄表及表计校验业务方面的内部控制制度;

(2)抄表员是否按固定日期和周期到用户处抄表,现场应仔细核对表号、互感器倍率等相关的信息;

(3)是否对集抄、远程抄表方式应定期核对;

(4)抄表员对抄回的信息(表码、业务变更情况、电量突增突减情况)是否进行核对并根据异常情况(包括窃电、违章、电量骤增骤减等)如实填报内部工作传单,相关业务部门根据内部工作传单进行现场核实处理;

(5)抄表员核实确认抄表数据后是否及时将抄表数据上传到营销mis系统;

(6)电费复核人员是否对抄表数据及业务变更传单及表计轮换、退补电量及违约用电检查事宜进行电费计算、审核;

(7)计量中心是否对用户用电表计进行定期校验;

(8)用电表计定期校验台帐是否齐全,用户是否签字认可,满意度如何。

4、收费

关键控制点:抄表周期、抄表方式、信息反馈、电费复核

关键控制点风险识别主要内容:

(1)是否制定有电费收费方面的内部控制制度;

(2)电费管理中心是否与银行进行对帐、平帐;

(3)确认后的电量,电费计算结果形成电费应收数据信息是否全部通过审核;

(4)营销部是否定期根据银行进帐单、缴款单统计实收电费,制定电费回收情况表并欠费账龄分析表;

(7)营销部是否依据欠费催缴办法对拖欠电费的用户进行催收,并对电费回收进行考核;

(8)计划部根据营销部销售电量和调度所口子的电量计算线损,是否对异常线损波动进行分析并检查偷漏电等异常情况。

三、生产部

关键控制点:工程项目立项、设计、计划、实施、工程款项支付、验收及竣工决算。

关键控制点风险识别主要内容:

1、企业是否建立健全工程管理制度,包括“五制”(即项目法人负责制、资本金制、招投标制、工程监理制、合同管理制)执行情况,重点检查招投标制、合同管理制、工程监理制的实施,工程管理组织形式是否科学;

2、工程项目立项是否经过充分的技术论证和财务评价,预算管理委员会是否审查,防止论证不科学而造成投资上的损失和浪费;

3、工程设计委托的单位是否具备资质,是否签订合同;监督工程项目是否严格实行计划管理,投资计划是否报省公司审批,年度资金预算是否落实;

4、是否对施工队伍资质进行审查、实行招投标制、签订施工合同等,是否实行工程监理制,隐敝工程是否由项目负责部门(或业主)两人以上签字认可;

5、是否按合同支付工程备料款和工程进度款,工程质保金是否按合同留足,是否严格控制成本费用;财务人员是否全过程参与了工程项目各个阶段;

6、工程项目是否存在以预算代决算,工程造价是否突破概预算,是否按要求由相关部门组织验收,竣工验收资料是否齐全,并及时办理竣工决算手续,审计部门有否进行审计,废旧物资是否按规定办理退库手续,或处理的废旧物资收入是否入账;

7、是否制定了本单位工程项目管理办法和工程竣工决算报告具体实施办法,单位对竣工工程项目是否及时编制了工程竣工决算报告,单位投资项目是否实行统计制度和月度分析制度并定期上报、竣工决算报告是否经过单位内部或中介机构的审计,单位财务、计划、基建等相关部门在工程决算报告编制中是否履行了相应的职责,是否对重大投资项目实行后评估制度。

四、物资公司

关键控制点:材料物资计划、采购、合同、验收、入库、领用、清查。

关键控制点风险识别主要内容:

1、材料物资管理制度是否建立和完善、管理职责是否划分清楚,不相容职务是否分离;

2、材料物资计划管理是否科学,有否根据生产部门需求申请编制;

3、材料采购是否严格实行招投标管理制和合同管理制,采购权根是否划分清楚;

4、材料入库是否组织相关部门针对材料数量、品种、规格、质量价格进行现场验收,款项支付是否按合同和验收无误后的结算单据进行;

5、材料的领用手续是否完备,仓储人员有否不按规定的手续发料,仓储人员有否及时根据领料单登记材料台帐,财务部门稽核人员有否去现场进行稽核;

6、材料的仓储管理是否科学,有无因管理责任造成材料物资霉变损失或流失;各单位对“二级库”的管理是否有明确具体的办法措施,职责是否明确;

7、有否定期组织清查盘点,做到帐账相符、帐实相符,对盘盈盘亏的材料物资是否查明原因、分清责任,并按规定权限报批;

8、单位废旧物资处理是否有明确统一的规定;

9、废旧物资是否单独保管,废旧物资的处理是否及时入账。

10、各物资需求部门是否根据实际工作需要将物资(预算范围内)采购申请报审批部门;

11、预算外采购是否明确专门的审批权限;

12、由招投标领导小组对标书审定后,是否对外统一;

13、非招标采购的询价人与采购人职务是否分离;

14、是否建立供应商评价机制,对询价结果进行书面分析,供应商的确定是否符合比质比价原则;

15、招标采购与非招标采购合同的签订是否经过纪检、审计、法律、财务等部门的审核及会签。

五、阳光公司

关键控制点:各乡镇供电所经济平安风险管理的三大模块(货币资金、营销管理、物资管理)

关键控制点风险识别主要内容:

1、货币资金管理

(1)是否建立发票管理制度,明确管理责任人。

(2)收取的电费现金是否当日送存电费账户(含供电所所在地以外的电工收取的电费),偏远地区且在当地未开设账户的是否在收费人员回到电费账户开设地当天将电费送存电费账户。

(3)核算员是否根据开具的电费发票情况登记应收电费明细账,并根据营销报表登记电费总账,电费总账和明细账每月必须核对一致。

(4)供电所在每月月末是否将当月的零星安装工程、对外提供劳务等零星工程收入、对外提供劳务收入上交阳光公司财务部。

(5)供电所不核算其他业务收支,但是否逐笔、序时登记其他业务收支备查薄。

(6)供电所经费是否须逐笔、序时登记现金日记账和经费收支备查簿。

(7)供电所核算员是否每日终了要清点现金,将现金实有数与现金日记账的当天余额相核对,保证账款相符。

(8)供电所所有银行账户是否应纳入县公司财务统一管理、核算;供电所核算员是否在每月末将银行存款日记账与银行对账单核对,在次月5日前核对完毕并编制余额调节表。

(9)供电所是否在《乡镇供电所财务管理办法》规定的范围内使用现金,是否制定严格的现金支付、审批、复核的程序,是否应设定现金支付的最高限额;核算员在付款和结算办理完毕后,是否在凭证上加盖私章。

(10)劳务费返还、绩效考核奖等自有资金的二次分配是否及时登记其他业务收支备查簿并定期与阳光公司对账。

2、电力营销管理

(1)具体用户的电价类别是否根据核定相关信息确定并由双方签订的供用电合同。

(2)表卡上规定的基础信息资料和设备台帐资料、供用电合同上用户信息是否一致。是否由专职人员到用户现场查看,核实相关用户信息。

(3)抄表员在初次抄表时是否复核用户用电性质及电价类别。

(4)每年是否按规定定期开展用电检查和营业普查,查看计量方式、用电性质、用电容量及设备、电价执行情况等。

(5)用户变更用电时,是否及时进行现场勘察、办理变更手续并变更供用电合同和电费卡。

(6)签订供用电合同的人员与审核人员职务是否分离。

(7)高压用户施工是否报县公司审核,施工图设计完成后,是否由县公司营销部组织勘察、设计、施工。

(8)高压客户工程需组织施工中间检查,是否对用户工程从技术和安全性等方面进行验收,乡镇供电所业扩工程施工收费是否符合规定并全额上缴阳光公司,施工和验收岗位相是否分离。

(9)装表接电后,是否检查计量正确性,用户验收确认表计轮换进行审核。

(10)是否由线损管理员对装表单或换表单填写的内容,如原表指数、新换或新装表指数、换表前电量、换表后倍率确认等进行认真审核。

(11)是否制定抄表及表计校验业务方面的内部控制制度;

(12)抄表员是否按固定日期和周期到用户处抄表,现场应仔细核对表号、互感器倍率等相关的信息;

(13)对集抄、远程抄表方式是否定期核对;

(14)抄表员对抄回的信息(表码、业务变更情况、电量突增突减情况)是否进行核对并根据异常情况(包括窃电、违章、电量骤增骤减等)如实填报内部工作传单,相关业务部门根据内部工作传单进行现场核实处理;

(15)抄表员核实确认抄表数据后是否及时将抄表数据上传到营销mis系统;

(16)电费复核人员是否对抄表数据及业务变更传单及表计轮换、退补电量及违约用电检查事宜进行电费计算、审核;

(17)计量中心是否对用户用电表计进行定期校验;

(18)用电表计定期校验台帐是否齐全,用户是否签字认可,满意度如何。

(19)电费发票是否根据当月抄表员实际抄回的用电量及相应的电价开具,发票上填写的单价、用电量和总金额应当核对一致。

(20)mis系统打印电费发票前,是否对票面进行核对。

(21)微机员与抄表员职务是否分离。

(22)收费员收取的电费是否全额上缴县公司电费专户,是否存在截留。23、编制欠费清单交责任电工(收费员)是否单独保管用户的欠费发票。电费资金的缴存、记账,抄表和收款是否职务分离。

(23)是否根据销售电量和供电关口电量计算线损并设专人对台区线损进行管理。

(24)线损在每月的测算值应在一定的区间内,若差异太大,检查是否存在设备故障或偷、漏电等异常情况并及时反映。

(25)是否存在将预收性质的电费冲抵应收,是否将回收老欠电费抵当月应收或用其他资金垫付或经费冲抵,以达到通过对工作绩效考核的情况。

(26)核算员是否每月记录电费账,核算电费明细账,核对各台区电费回收情况,定期与县公司财务部核对电费往来。

(27)是否建立上门催收、电话催收或制定其他催收制度。

(28)核销电费是否符合规定程序,收回以前年度核销的电费账务处理是否正确

3、物资管理

(1)领用物资是否及时入库,领用物资与实际入库是否一致。

(2)验收后是否及时进行帐薄登记,能否做到字迹工整、清晰,不涂改,日清月结,并保持帐、卡、物三相符。

(3)是否制定了仓储保管的相关规定,是否对仓储保管员的职责做了详细说明。

(4)仓储物资是否堆放合理、牢固、包装完好,摆放整齐、通道畅通、存取方便。

(5)库容库貌是否干净整齐,库存物资是否做到“四号定位、五五码放”。

(6)是否根据需要设置安全员岗位并制定相应的职责,消防、防盗、防潮设施配备是否齐全。

(7)是否定期或不定期的进行消防、防盗设施的检测并进行记录。

(8)物资保管员是否能正确报警和使用消防器材,是否制定了危险品管理制度。

(9)易燃、易爆物品是否按照标准规定存放,是否存在混库现象。

(10)对生产或工程结束后退回的剩余材料是否及时办理入库手续,以确保其成本开支的真实性。

(11)是否进行经常性和定期性的盘点,确保在库物资数量同计算机库存数、帐、卡、物四相符。

(12)盘点后的盈亏是否认真进行原因分析并按相关规定进行处理。

(13)是否制定了切实可行的物资领用审批程序,并得到有效执行。

(14)特殊物资(如事故备品)是否由使用部门申请后经专门人员审批并办理领用手续后方可领用。

(15)仓管人员发料前是否对领料单中的物品名称、规格、数量、签字审批手续等进行认真的校对,能否做到严格按单发料。

(16)发料是否坚持先进先出原则,以缩短物资在库时间,防止物资过期变质。

(17)是否存在白条抵库的现象?物资领用后是否能够及时、准确的记录领用情况?

(18)工程中以料抵工的零星废旧物资是否在决算中重复列支拆除费用,是否按照权限处置废旧物资。

(19)是否存在隐瞒废旧处置收入形成帐外资产的情况。

附件2:

供电公司经济平安风险管理评估工作任务分解表

序号

主要内容

工作内容分解

分管领导

责任人

责任部门

配合部门

时间安排

1

制定工作计划,明确具体工作内容工作措施。

1、转发文件,组织人员学习省公司经济平安风险管理工作指导意见

宋亚

张军

监察审计部

公司各单位

8月份

2、制定下发经济平安风险管理的具体实施方案通知

宋亚

张军

监察审计部

公司有关部门

2

根据省公司工作目标、工作范围、工作要求、工作要点制定具体工作计划,分解风险管理模板,开展风险识别、风险评估和风险控制。

1、货币资金风险管理控制模板

张小东

吴军

财务部

公司各单位

8月份

2、固定资产风险管理控制模板

张小东

吴军

财务部

公司各单位

3、成本费用风险管理控制模板

张小东

吴军

财务部

公司有关部门

4、农维费管理控制模板

张小东

李凤春

吴军

卢山

财务部

阳光公司

各乡镇供电所

5、重大决策事项管理控制模板

张小东

吴军

财务部

6、电力营销管理控制模板

唐亚非

余红

营销部

客服中心

7、工程建设管理控制模板

梅杰

姚小平

生产部

各生产单位

8、物资管理控制模板

刘荣海

崔玉民

代建国

物资公司

9、各乡镇供电所风险管理控制模板

李凤春

卢山

阳光公司

各乡镇供电所

3

完成风险的识别、评估等

将评估结果,明细台帐、报表、报告报送审计部和分管领导

宋亚

张军

监察审计部

公司各单位

9月份

4

监督与监察

监察审计部组织对各单位风险管理工作开展情况进行监督检查。

宋亚

张军

监察审计部

公司各单位

10月份

附件3:

经济平安风险识评估方法——lec法

经济平安风险评估方法参照安全生产风险评估中的lec法,用与系统风险率有关的三种因素指标值之积来评价风险程度的一种方法,公式是:d=lec。其中:l——发生风险的可能性大小;e——风险发生的频度;c——一旦发生风险会造成的损失后果;d——危险性。

l的取值参考

e的取值参考

分数值

风险发生的可能性

分数值

风险发生的频繁程度

10

完全可以预料(会发生)

10

每天

6

相当可能发生

6

每周一次,或偶然

3

可能发生,但不经常

3

每月一次

1

发生的可能性小,属于意外

2

每季度一次

0.5

很不可能发生,可以没想到

1

每年-至两次

c的取值参考为:

分数值

发生风险产生的后果(对企业)

发生风险产生的后果(对干部个人)

100

特别重大损失(达500万元以上)、特别重大影响(国家)

违法犯罪,情节十分严重,影响特别恶劣

40

重大损失(达100万元以上)、重大影响(省)

违规违纪,情节严重,影响恶劣

15

严重损失(达10万元以上)、严重影响(市、省公司)

违规违纪,情节较重,影响较严重

7

较大损失(达1万元以上)、较大影响(本单位)

违规违纪,情节一般,影响较坏

3

一般损失(达1千元以上)、一般影响(所属二级单位)

违规违纪,情节较轻,影响较小

1

引人注目,需要补救(范围较小)

不构成违规违纪,影响轻微

d的取值参考为:

分数值

危险程度

评估结论

>160

高度危险,要立即整改

高风险

70-160

显著危险,需要修改

中风险

20-70

一般危险,需要注意

低风险

<20

没有风险

暂无风险

附件4:

供电公司风险管理明细台帐

部门(单位):

年月日

控制模板

关键控制点(风险点)

基础资料来源

风险识别

风险类别

风险评估(定量)

风险评估(定性)

风险等级

风险管理措施

有无内控制度等

内控制度是否完善

执行考核是否有效

发生概率(e)

发生可能(l)

发生后果(c)

风险值(d)

问卷调查

集体讨论

行业比较

政策分析

风险策略

管理工具

管理责任人员

单位负责人:

填制人:

附件5:

经济平安风险管理实施情况一览表(半年报)

年八月二十七日

本期实施风

险评估事项

对应

模板

主要情况描述

风险属性

风险

处理

策略

现有风险

未来风险

风险

一般

风险

风险

暂无

风险

风险

一般

风险

风险

暂无

风险

1

2

3

4

备注:1、“对应模板”项按经济平安风险管理规定的模板名称填列,如基层单位有改动,则按基层单位改动后的对应模板填列。

2、“主要情况描述”内容包括:风险评估实施过程的简单描述、存在的风险及其原因(原因应从外部、内部影响因素分析,内部因素分析应从制度的健全性和执行的有效性两个方面进行分析)。

3、“风险属性”项请在对应项直接划“√”。

4、“风险处理策略”项请按照省公司“审工作19号”文规定填列,即填列“控制、承担、其他、需上级协调解决的风险”。

5、本表按评估的事项一事一列。