工程监理的主要内容优选九篇

时间:2024-01-09 09:52:03

引言:易发表网凭借丰富的文秘实践,为您精心挑选了九篇工程监理的主要内容范例。如需获取更多原创内容,可随时联系我们的客服老师。

工程监理的主要内容

第1篇

关键词:水土保持;监理工作;主要内容。

Supervision of soil and water conservation program and the main content

Ni ya shan mu•ta xi

(xinjiang kuqa water bureau, xinjiang , kuqa 842000)

Abstract:soil and water conservation supervision work according to the national - must have to soil and water conservation is the total target design, in accordance with the relevant state laws and regulations of soil and water conservation and engineering of soil and water conservation, soil and water conservation to engineering contractors the terms of the contract implementation supervision and management, promote the implementation of water and soil conservation project according to the contract target, prevention and control of soil erosion caused by construction activities.

Keywords:soil and water conservation; Supervision work; The main content.

1.水土保持监理工作程序

水土保持监理的工作内容主要是工程施工期间的水土保持质量控制、建设各方水土保持工作的组织和协调及有关水土保持的合同与信息管理。根据隐蔽 工程建设的实标情况和水土保持监理的特点,其工作程序如图所示。

2.水土保持监理工作内容

2.1施工准备监理

2.1.1组织水土保持监理交底会,向施工单位提出应特别注意的水土保持敏感因子和有关水土保持要求及监理的工作程序。

2.1.2在单位工程开工前,对施工单位报送的单位工程施工组织设计中有关水土保持的内容进行审核,从水土保持的角度提出优化施工方案与方法的建议并答署意见,作为监理单位对施工组织审核意见的一部分。

2.1.3检查施工单位水土保持准备工作落实的情况。

2.2施工过程监理

2.2.1检查施工单位水土保持管理机构的运行情况,要求承包人在施工过程中按已经批准的施工组织设计中的水土保持措施和有关的审核意见进行文明施工,加强水土保持管理,做好施工中有关水土保持的原始资料收集、记录、整理和总结工作。

2.2.2检查施工过程中施工单位对承包合同中水土保持条款执行与措施落实等情况。

2.2.3现场水土保持监理主要采取巡视检查方式,并辅之一定的检测手段,对施工单位的水土保持工作进行跟踪检查和控制,作出定性和定量的评价。

2.2.4主持召开工程区域范围内与殊途保持有关的会议,对水土保持方面的意见进行汇总,审核施工单位提出的处理措施。

2.2.5协调建设各方有关水土保持的工作和有关水土保持问题的争议。

2.2.6对施工单位在施工过程中的水土保持实施情况,以水土保持监理月报方式定期作出评价,并及时反馈给施工单位、工程监理、建设代表处和监理中心等有关单位。

2.2.7对施工单位的进度支付,水土保持监理答署对施工单位实施水土保持措施的评价意见,作为计量支付的依据之一。

2.2.8编写水土保持月报和工程水土保持监理报告。

2.3工程验收监理

2.3.1审查施工单位报送的有关工程验收的水土保持资料。

2.3.2对工程区水土保持质量状况进行预见,主要通过感观和利用水土保持监测单位的资料与数据进行检查,必要时进行水土保持检测。

2.3.3现场监督检查施工单位对水土保持遗留问题的处理。

2.3.4对施工单位执行合同水土保持条款和落实各项水土保持措施的情况与效果进行综合评估。

2.3.5整理验收所需要的水土保持监理资料。

2.3.6参加工程验收,并答署水土保持监理意见。

3.水土保持监理范围和工作重点

3.1监理工程师审查施工组织设计时,应对施工单位在工程施工的水土保持措施、方案、实施办法进行审核。符合相关规定的,有监理工程师提出审核意见,报总监理工程师批准。

3.2审查施工单位现场的水土保持组织机构专职人员、水土保持措施及相关制度的建立,是否符合要求。

3.3督促施工单位与当地环保部门建立正常的工作联系,了解当地的水土保持要求和相关标准,取得当地环保部门的支持。

3.4施工过程中建立工作时对施工单位水土保持措施进行跟踪检查,对水土保持工程项目进行检查及验收。

第2篇

【关键词】:监理规范内容调整修订

中图分类号: G264 文献标识码: A

一、内容调整的主要原因

《建设工程监理规范》GB/T50319-2013于2013年5月13日,于2014年3月1日开始实施,本规范相对于《建设工程监理规范》GB/T50319-2000的内容进行了调整和修订,主要原因是随着我国建设工程管理体制改革的不断深化和监理单位服务范围的不断拓展,在工程勘察、设计、保修阶段为建设单位与相关服务也会越来越多,为了与时俱进,进一步规范建设工程监理与相关服务行为,提高监理服务水平,《建设工程监理规范》GB/T50319-2013相对于《建设工程监理规范》GB/T50319-2000内容进行了调整修订。

二、《建设工程监理规范》GB/T50319-2013的修订内容

《建设工程监理规范》GB/T50319-2013共分为九章和三个附录,比《建设工程监理规范》GB/T50319-2000规范增加了第九章内容,即相关服务。2013规范修订的主要内容有:1、增加相关服务和安全生产管理的内容;2、调整部分章节的名称;3、删除了部分不协调或与法律规范、政策、标准不一致的内容;4、强化了可在操作性。

三、2013规范的调整与修订

《建设工程监理规范》GB/T50319-2013的九章内容目录分别是:1、总则。2、术语。3、项目监理机构及其设施。4、监理规划及监理实施细则。5、工程质量、进度控制及安全生产管理的监理工作。6、工程变更、索赔及施工合同争议处理。7、监理文件资料管理。8、设备采购与设备监造。9、相关服务。第一章总则中2013规范比2000规范增加了以下几条:开工前,建设单位应将工程监理单位的名称、监理范围、内容和权限及总监理工程师的姓名书面通知施工单位,实施建设工程监理宜实施信息化管理。第2章术语,2013规范比2000规范的术语解释增加了以下几点:监理单位、建设工程监理、相关服务、工程延期、工程延误、工程最终延期批准,监理日志、监理月报、监理文件资料、而且对总监理工程师代表和专业监理工程师的要求与2000规范的要求有所不同,2000规范要求总监代表和专业监理工程师必须是取得国家监理工程师执业资格证书并经注册的监理人员,而2013规范要求总监代表条件放宽,是具有工程类注册执业资格或具有中级以上专业技术职称,3年以上工程实践并经监理业务培训的人员。专业监理工程师是具有工程注册执业资格或具有中级以上专业技术职称,2年及以上工程实践经验并经监理业务培训的人员,第三章中2013规范比2000规范总监职责多出以下2条:1、组织检查施工单位现场质量安全生产管理体系的建立及运行情况。2、参与或配合工程质量安全事故的调查和处理。专业监理工程师职责多出以下2条:收集、汇总、参与整理监理文件资料;2、参与工程竣工预验收和竣工验收。2013规范第五章除了工程质量、造价、进度控制内容外,还增加了安全生产管理的监理工作。2013规范第六章的名称更名为工程变更、索赔及施工合同争议处理。原2000规范第六章的名称为施工合同管理的其他工作。2013规范第七章监理文件资料管理中,监理月报的内容列举了4条主要内容,并且增加监理日志的主要内容5条,2013规范中第八章设备采购文件资料内容概括为6条主要内容,设备监造文件资料概括为20条主要内容,2013规范比2000规范增添了第九章内容相关服务,2013规范附录A类表为监理单位用表,原2000规范为承包单位用表,内容中增加了:总监理工程师任命书,工程开工令、监理报告、旁站记录、工程复工令。2013规范附录B为施工单位报审报验用表,原2000规范附录B为监理单位用表,内容中增添了施工进度计划报审表,C类表为通用表,2000规范附录C也为通用表。2013规范C类表增添了索赔意向通知书。

四、结束语

《建设工程监理规范》GB/T50319-2013由住房和城乡建设部负责管理,中国建设监理协会负责具体技术内容的解释,在2014年3月1日开始实施,通过对《建设工程监理规范》GB/T50319-2013的学习,认识到随着社会的发展,《建设工程监理规范》的内容也得到了及时的调整和修订,以便于广大监理人员更好的贯彻和执行。

参考文献

[1] 宋彦,魏利敏.对有效实施安全监理的几点建议[J]. 郑州经济管理干部学院学报. 2006(02)

[2] 王咏梅.关于建筑施工监理若干问题的研究[J]. 科技创新导报. 2007(34)

[3] 沈耀胜.监理行业现状问题及发展思路[J]. 建材与装饰(下旬刊). 2008(07)

第3篇

公路工程建设施工一般具有战线长、工作面广的特征,所以影响其施工因素比较多,因此必须加强公路工程监理工作,从而切实保障公路工程质量。本文阐述了公路工程监理的主要内容,对公路工程监理的现状及其策略进行了分析。

关键词:

公路工程监理;主要内容;现状;策略

1公路工程监理的主要内容

公路工程监理的内容主要为进行质量、进度与费用的控制以及对合同和信息的管理以及工程的组织协调,并且监理工作的主要内容是相互联系。如果没有质量保障,公路质量则无从谈起;如果罔顾工程进度,就会导致公路工程不能按时完成;如果没有良好的费用控制,那么公路工程则会导致超支或亏损。哪一个环节发生问题,都会严重影响公路工程的建设。但在这三项工作之中,质量是工程建设的根本,其是公路工程建设的核心,其核心工作的完成又需要费用控制和进度完成的促进。

2公路工程监理的现状分析

公路工程监理的现状主要表现为:①当前监理工作以工程质量的监理为主。当前公路工程建设过程中,相关工程监理制度和规章都是以工程质量为主,忽视了其它重点内容的规范,因此这种侧重片面的监理工作影响了工程进度以及工程费用的管理控制。甚至有些工程业主限制工程监理只对公路工程的质量进行监理和控制,从而影响了监理工作在工程进度和工程费用等各个方面的作用。②监理机构层次与合同段相对较多的现状。虽然市场经济体制改革多年,但仍然会受到计划体制的影响,工程业主通常会自主设立上层的工程监理机构,从而与基层单位的社会公路工程监理单位相混合。使得多层机构下的工程监理变得比较混乱,出现权责不甚分明、互相制约的问题。并且从公路建设地域而言,基于我国幅员辽阔以及地形地质也各不相同,公路建设工程施工方式也就不尽相同。因此多样化的地域条件下的公路工程管理对于公路工程施工和监理就比较细致,从而出现公路工程施工标段和公路工程监理标段多的现象。③公路工程监理未能达到全过程监理。我国的《公路工程施工监理规范》当中明确要求,工程监理应在公路工程招标之前确定公路工程监理单位。但是当前公路工程监理工作的重点,一般在公路工程施工阶段,正因为这样,公路工程监理难以实现公路工程全过程的良好监管。由于没有参与工程的前期招标,难以掌握承包人的资质、施工能力等方面,出现问题时更是不好处理,从而不同程度的影响工程质量。

3加强公路工程监理的策略

(1)加强工程质量管控。全完善各项规章制度和管理措施。健全的制度是保障公路工程顺利进度的有效手段。所以,良好的工程监理制度要以工程质量管理和控制为根基开展进行,并以此作为工程监理的监理依据和原则,从而有效监管控制公路施工过程中的各个建设环节。因此,依据监理制度和规范,有效结合工程实际,应制订出一系列的管理制度和规章,如监理监理工程师职责、内业管理制度、例会制度、奖惩制度、考勤制度、廉政建设制度等,此外还要规范好施工中的计划管理流程、质量控制及验收流程、质量事故的处理流程以及测量支付管理流程等等。只有保证了监理工作的规范有序开展,才能有效保障公路工程质量,推动工程顺畅进行。②建立健全自检体系。施工方的工程自检是保障工作质量的根本,更是工程施工的关键第一步。所以,工程监理要督促协调施工方建立、健全工程质量保障体系,在施工做好自我检查与测定,通过施工中每个步骤和控制和管理。(2)强化工程进度的管控。①公路工程进度控制内容。对公路工程的进度控制主要包括以下内容,审定工程承包人制定的各期施工计划及其工、料、机是否均衡一致,对不协调的地方要进行调整,确保完工期限。与此同时要依据现场监理工程师的工作记录绘制出公路工程进度曲线图,进行对比分析后据工程进度及时做好各方面的工作调配与调整。并要对出现延期和质量不符和地方提出整理和处理意见。②公路工程进度控制原则。公路工程建设要做到有效的控制与管理,必须科学制订施工计划,以有效的施工方法和健全严谨的施工组织,良好的运用施工人力、物力,规范执行合同条款,严格按照技术规定来进行施工。(3)严格公路工程费用控制以及合同管控。①费用控制。公路工程建设施工中,各项费用开支要严格依据施工合同来对照进行,对不符合同条款、技术规范以及工程量的,要及时指出并进行调整,在支付时严格审核有关施工材料和,确保准确、适时。②合同管控。合同管控主要是对公路工程的各项内容进行梳理监管和处理,各项目的计量与支付必须要有详细的证明材料和施工监理记录才能上报审批,并且要保持监理工作中的公平、公正、合理、合法以及准确、及时。对与合同规定有出入与需要延期的,要具备充足的证明材料和指令,对违约责任和出现的争端、仲裁决定要按照惯例以及合同中的有关规定,收集提供充分的证明材料,对工程的分包、转让、保险等要按合同与相关的法律法规进行处理。

4结束语

公路工程监理工作是公路工程建设当中的重要内容,其在公路施工中起着至关重要的作用。随着公路工程建设的发展,公路工程监理变得更加重要。因此对公路工程监理的现状及其策略进行分析具有重要意义。

参考文献

[1]李红星.关于公路工程中的工程监理问题研究[J].民营科技,2012(7).

[2]董欣利.公路工程监理存在问题及对策[J].交通世界(工程技术),2015(05).

第4篇

【关键词】道路工程监理,监理工程师

学习过工程监理这门课,使我对土木工程、道桥建设有了更加深刻的认识,土木工程的主体是在设计建造,但是还有及其重要的一个方面使我们不容忽视的,那就是工程监理。如果说兴土木是一门艺术的话,监理工程是其上浓墨重彩的一笔。

下面,就结合道路监理的主要内容进行详细阐述。

道路工程监理的主要内容是道路工程建设的投资控制、建设工期控制、工程质量控制、安全控制;进行信息管理、工程建设合同管理;协调有关单位之间的工作关系,即“四控、两管、一协调”。工程项目建设监理是与国外接轨并结合中国国情,在工程建设领域中进行的一项重大改革。跟国外的对业主提供工程项目管理服务是相似的。工程监理根据业主需要可以为业主提供工程项目全过程或某个分阶段,如施工阶段的监理。

1、工程质量控制是关键

由于影响道路工程质量的因素很多,在道路工程建设中,监理工程师应对道路工程技术规范和规程以及合同文件熟练掌握,融会贯通,从原材料、施工工艺、施工过程都要进行全面的监控和管理,加强自己工作的责任心和主动性,并做好以下几个方面:

(1)要做到分工明确,责任到人。根据工程项目进行明确分工,特别是路基土石方、桥涵构造物、路面各结构层等关键要害部位。做到分工明确、各负其责,以便对每道工序进行全方位、全过程的控制和管理。这样就避免因出现工作混乱,职责不清而影响工作效率。

(2)质量控制的主要依据是合同条款、技术规范和设计图纸。设计图纸和技术规范规定了工程的质量标准,而合同条款则是要求施工单位按照设计图纸和技术规范中注明的材料性能、施工工艺进行施工。质量控制的基本要求是控制好原材料的质量。因此我们要根据质量控制的依据和要求进行现场监督和管理。严格控制原材料的进场质量。原材料是影响公路工程质量的根源所在,因此要加强所用原材料的检验和检测,这就要求我们在原材料进场前和进场后都要不定期的进行抽样检测,一旦发现不合格就要拒其进场或拒其使用,将影响质量的隐患扼杀在萌芽状态。全过程监理是工程质量控制的基本方法。全过程监理是对某项工程质量的事前控制、事中控制、事后控制。事前控制是指对工程准备阶段的控制,事中控制是指对工程施工过程的控制,事后控制是指对工程结束后质量的控制。隐蔽工程的监理是工程质量控制的重点。隐蔽工程是质量隐患的埋藏点,也是最不容易控制的。因此隐蔽性很强,控制起来就难,作为监理控制来讲最好的办法就是进行过程控制,对施工过程中的每道工序都要细致检查和全方位旁站,及时发现施工中的缺陷,并迅速排除掉,避免工程隐患的出现,必要时留下工程照片。

2、工程进度的监控

工程的工期在合同中是有明确规定的,同时工程能否按期竣工涉及到业主和承包商的重大利益,因此监理工程师要根据合同严格控制施工工期。在工程监理具体的实施过程中,要想有效地进行进度控制,还要注意以下两个方面:

(1)要求现场监理人员对分部分项工程的进度逐一分解,单独控制,对自己控制管理的工程细目做出相应的月进度、旬进度控制图和形象进度表,以便明确的找出实际进度与计划进度之间的差距,并及时了解分析原因,督促施工单位采取补救措施,以便施工进度与计划同步。

(2)采用网络计划对工程进度进行监督和控制,因为它是一种科学的管理模式,它在编制网络计划时,已经对各种不利或有利的影响因素作了科学系统的分析归纳。这样使用它就可以随时检查工程进度进展情况,掌握关键线路改变情况,以便及时地调整、优化、指导施工。

3、关于工程费用的监理

费用的管理是与工程质量和进度相辅相成的,都是工程监理的基本手段。只有质量合格的已完工程才能计量支付,因此工程质量是费用支付的基础,而进度是计量支付的保障。因而我们在进行质量和进度控制的同时,也要把费用管理进行有效的控制。费用的控制主要是通过计量支付来实现的,合理的计量支付有助于工程的管理。但必须防止两种倾向的发生:

一是超前支付,它容易造成业主的资金紧张,更容易造成承包商不愿更多的投入;

二是滞后支付,它容易造成承包商的资金紧张,甚至会因资金周转困难而影响进度和质量。

另外根据现场实际情况进行的优化设计,可以为业主节省费用;合理的变更设计,可以使业主的有限资金得到更好的利用。

目前我国实行的还仅仅是施工阶段的工程监理,还没有设计阶段的工程监理,但在市政工程和房屋建筑工程这两个工程行业实行了施工图审查制度,相当于一种变通了的设计阶段的工程监理,但也局限于这两个工程行业。这对于确保工程建设质量和安全,提高工程建设水平,充分发挥投资效益的目的还是远远不够的。道路工程是一个整体,道路工程监理是围绕合同管理进行的质量、进度、费用的有效控制。随着道路工程建设监理制度的引入和在实践中的运用,工程监理制度将越来越完善。

道路监理工程师,主要负责道路工程的质量、道路工程技术方案的初审工作及装配式挡墙工程施工的质量控制,施工方案的落实工作,对与道路、挡墙工程相关的施工承担协调责任。

如今,随着国家铁路、道路投资逐渐增加,城市网建设逐渐完善,对于道路建设的要求也越发严格,在这样的大背景下,道路工程监理工作标准更加严格,而且作用和影响也更加巨大。全方位的工程监理工作如何细致有序的进行,在依照国家政策和法律的同时,也需要经验丰富,严谨认真的监理工程师保证监理工作健康进行,这更是我国道路建设的有力保证,不难发现,监理工程师工作对道路设施基础建设具有举足轻重的作用。参考文献

[1]《建设工程施工现场监理人员实用手册》

[2]《监理行业管理规章制度全集》

第5篇

关键词:建设工程;监理;状况;探讨;建议

一、当前建设工程监理现状

现阶段我国工程监理事业在旧的管理体制中探索着一步步发展,已经取得了一定成绩,但仍存在许多问题,主要表现在以下几个方面:工程监理法规体系和工程监理市场体系不完善,缺乏专门调控和规范建设监理高层次的法律法规。目前,虽然我国已经有一些相关的法律、法规对行业进行整理、规范,但建筑工程监理行业发展的太快,且中国的监理行业起步较晚,所以出台与之相应的法规、条文势在必行。建设工程监理覆盖面宽,服务内容肤浅。目前我国的建设工程监理绝大部分停留在施工阶段的管理服务上,且侧重质量管理,离全方位、全过程服务还有较大距离。监理其实是深入的、细致的管理工作,只有小的地方、环节、部位不出问题才能有整体的目标达成。监理组织机构不健全,人员整体素质不高。主要反映在,我国的监理人员来源比较广泛,主要来自基建管理部门和施工单位、大专院校、科研院所和勘察设计单位,他们由于在知识结构、管理知识和法律知识方面缺乏,且少有机会接受岗前培训和实践探索,所以很难有效地发挥组织、协调、管理作用,开展监理工作。监理取费普遍较低。严重制约着监理行业的发展,很多工程项目的监理费甚至达不到合理的监理成本水平,使监理企业无法挽留和吸引高素质监理人才,严重影响了监理人员的积极性,难以发挥监理应有的作用。同时,由于缺少必要的经费,多数监理企业无力组建能满足工程监理工作需要的完备实验室,缺少性能优良的检测、监测仪器和设备,从而使监理工作受到影响。监理机构难以完全行使监理职责。在建筑行业市场机制中,市场的主体应该由业主--监理机构--承包商三方构成,三者之间的关系是业主授权,承包商实施,监理机构监督,相互衔接,层层制约的关系,以保证工程的顺利展开和最终目标的达成。监理机构在其中扮演监督的角色,监督承包商的所有与项目有关的工作,对业主负责,然而,监理工作在实际开展的时候却未必能完全扮演好自己的角色,很多时侯,监理工程师被充当作承包商的质检员。业主对施工过程主观干预较多。业主一般不具备项目管理能力,对基建程序尤其是监理制度不了解,经常出现市场行为不规范问题,突出表现为监理企业低价抢标和业主盲目压价;在委托监理业务时仅委托质量控制,随意压低监理费,拖欠监理费;在工程施工过程中,过多的干预监理工作。监理企业市场主体地位不清晰。普遍规模小,实力弱。

二、目前工程监理工作的主要内容

《建筑法》中规定:实施建筑工程监理前,建设单位应将委托的工程监理单位的监理内容及权限,书面通知施工承包企业。建筑工程监理应依照法律、行政法规及有关技术标准、设计文件和建筑工程承包合同,对承包单位在施工质量、建设工期和资金使用等方面,代表建设单位实施监督。监理工作的主要内容为:对项目施工招投标的监理。施工招投标工作的好坏,直接关系到业主能否选到优秀的承包商,能否得到先进的施工技术和施工方案。对施工质量的管理。做好施工质量的的监理,是确保工程顺利进行,达到预期目标的保障。这个环节的管理其实就是质量控制,做到每个环节不出问题,最终达到预期质量目标要求。对工程承包合同的管理。借鉴国际和国内工程管理的经验和教训,熟练掌握工程合同文件《FIDIC土木工程施工合同条件》,以法律为准绳,以合同为依据。对工程承包合同进行管理,项目总目标才能得以实现。:

三、改变目前建设监理状况的建议

规范企业和业主行为。规范企业和业主行为,是“三制”良性发展,工程建设项目实施的必要条件。加强监理人员法制理论学习,完善法律、法规体系。加强合同法、招投标法等相关法律法规的学习,依法对合同进行管理。高度重视并加强对工程建设监理合同和工程建设承包合同的深入学习和研究,是监理工作开展的重要理论依据,这是监理市场化之必须。加强承包商监理知识方面的理论引导,提高承包商对“监理”的正确认识,便于工程项目的实施。以市场需求为导向,向全方位、全过程监理发展。我国实行监理制已有二十多年的时间,但目前仍然以施工阶段监理为主,要想改变这一状况既要从完善既有的监理制度,也要加强建设单位和建立企业素质和能力的提高。强化从业人员职业素质,优化工程监理企业结构。加监理人员强岗前培训,提升业务水平,做到人尽其才,物尽其用,充分发挥监督管理作用。

四、总结

监理工作在工程建设中发挥了重要作用,其在建筑工程施工中的主导地位日益提高。在对控制工程质量、造价、工期等目标最终达成方面的影响日益显著。通过实行建设监理,在为建设工程提高施工质量、节约投资成本、缩短施工周期等方面创造了条件,建设监理工作,正逐步向规范化、专业化、科学化方向迈进。目前我国建设工程监理虽然还处在探索发展阶段,但随着市场的导向作用,其发展的速度正在逐渐加快,并且监理的内容和形式也正在发生变化,有理由相信,不远的将来一个成熟、完善、开放的监理行业会最终形成。

参考文献:

[1]中华人民共和国建筑法[S].1998.

[2]建设工程监理规范及条文说明[S].2002.

[3]田金信.建设项目管理[M].北京:北京高等教育出版社,2002.

第6篇

【关键词】新形势;公路建设;工程监理;问题

【 abstract 】 in recent years since, our country highway construction obtained a rapid progress and development, for the society and the state created a very generous social benefits and economic benefits. In the highway engineering built, supervision plays a very important role career. Although the highway engineering supervision work in the very great degree in China to promote the development of the cause of highway construction, but also exposed the problems. This paper briefly for highway engineering supervision of the main content is discussed, and a detailed analysis of the highway in the engineering supervision of the existing problems, and puts forward some effective measures, in hopes of our country in the future of the highway construction career have a positive role in promoting.

【 key words 】 the new situation; Highway construction; Project supervision; question

中图分类号:F540.3文献标识码: A 文章编号:

1. 前言

新形势下,我国重要的基础设施建设之一就是公路工程建设,为了能够切实的确保公路工程建设工作的内在质量,其质量保证管理模式通常采用的是“政府监督、社会监理及企业自检”,这一体系不可或缺的组成部分就是社会监理。

“一管理,三控制”是公路工程监理的重要内容,也就是合同管理、费用控制、进度控制和质量控制。从辩证的角度来看,公路工程监理的三控制是相互统一而又互相对立的一个有机整体。如果缺乏了进度的质量,那么公路工程就是一个“亏本”的工程,如果缺少了质量的进度,那么公路工程就是一个“豆腐渣”工程,此外,缺乏合理经济的费用支持也是无法想象的。由此看来,一旦公路工程监理工作的任何一个步骤和环节出现问题,都将会给公路工程带来难以估量的后果,必将对公路工程项目建设的正常进行产生直接的影响。

2.公路工程监理工作的主要内容

公路工程监理工作的主要内容具体包括组织协调、信息管理、合同管理、投资控制、质量控制、安全控制以及进度控制,其中工程质量的控制也尤为重要的。

2.1工程质量控制

(1)工程质量控制的依据就是设计图纸、技术规范和合同条款,技术规范与设计图纸明确的对工程质量标准进行了规定,合同条款则详细的对施工单位的施工工艺、材料性能和允许偏差进行了要求;(2)要责任到人,明确分工。应当按照工程项目做到分工明确,尤其是路面结构层、桥涵构造物和路基土石方等要害部位,必须切实的做到各负其责、明确分工,以全过程、全方位的管理和控制每道工序;(3)监控监理的重要手段是现场监督。通常现场监督都是通过旁站与巡视完成。公路工程监理人员应当对每一环节进行检查、旁站、巡视和抽样,及时的发现建设中所出现的问题,以便于尽快将问题加以解决。

2.2工程费用监理

公路工程的费用管理是和公路工程的进度及质量相辅相成的,都属于监理的基本环节和手段。只有从根本上确保质量合格,才可以将竣工的工程项目进行计量支付。所以费用支付的基础就是工程质量,而计量支付的重要保障则是工程的进度。所以,公路工程的监理人员在控制进度与质量的时候,还应当有效的控制费用管理。除此之外,还应当避免发生超前支付和滞后支付的不良倾向。

3.公路工程监理工作中所存在的问题分析

近几十年来,我国的工程监理体制的推行和实施取得了显著的成效。工程监理的实施,有效的提高了公路建设项目的投资效益,充分的确保了公路工程项目的质量,并且为我国的公路项目的建设积累了丰富的经验。然而,在我国的公路工程监理工作中,不管是工程监理的实践,还是工程监理的理论体系,都存在着一系列有待于迫切解决的问题。

3.1公路建设项目的监理实施局限在施工阶段

从总体上来看,我国的公路工程监理通常没有全程化的公路建设项目管理,这便造成了工程监理机构单一的业务范围,极易导致人才需求渠道的狭窄,这对人才的培养和人才的吸收是非常不利的;也极易导致工程监理机构的利润和收入来源单一,无法有效的抵御经济市场所存在的诸多风险,这将对我国工程监理企业的壮大与发展产生严重的制约。

3.2公路工程监理行业现代化的高素质人才不足

要想满足工程监理工作的不同需求,那么工程监理工程师就必须具备高水平的专业技术和专业能力。在西方一些国家,工程监理工程师基本上都具备硕士学位或者是博士学位,并且他们的工程监理工程师都属于复合型的应用人才。就我国的公路工程监理机构和企业来看,其工程监理人员绝大多数都是由一些已退离工作岗位的技术人员所构成的。此外,还有一些企业从事工程监理的工作人员是由一些缺乏实践经验、刚毕业的学生所组成,这些不良状况最终导致工程监理队伍两极分化现象的形成。所以,新形势下,我国的公路工程监理行业迫切的需要高能力、高水平的的应用型专业技术人才。

3.3公路工程监理企业存在一定的体制问题

现阶段,我国公路工程监理体制当中所存在的主要弊端和缺陷就是机构重叠、职能交叉以及政企不分,严重的缺乏竞争与活力。从严格的意义上来讲,多数公路工程监理企业都不是独立第三方和社会监理,基本上都属于建设部门所建立的一些国有制企业,其管理方式落后,产权不清晰,直接影响了公路工程监理企业的建设与发展,并且对工程监理市场的稳步发展也产生了极大的制约。

4.解决公路工程监理问题的有效措施

4.1促进公路工程监理企业形成独立的经营自

我国的公路工程监理企业和行政管理部门及业主之间的关系,在工作上应当保持相互协作、相互制约、相互统一的关系,在经济上和人事上应当保持互不干涉、互不影响的独立关系。因此,应不断的促进工程监理企业的独立化,否则便无法充分的确保公路工程监理工作的实际质量。在保证监理企业的相对独立之后,应当逐步的形成自我发展、自主经营、自我约束以及自负盈亏的科学机制,最大限度的面向整个公路和整个社会的公路项目建设市场来不断的增加业务量。在激烈的市场竞争下,公路工程监理企业还应当充分的考虑自身的发展与生存,不断的加强自身的工作能力和业务素质,只有这样才能够有效的确保最佳的工程质量。

4.2提高工程监理人员的综合素质和能力

我国的工程监理行业的在职人员基本上都是从离退人员、设计的富余人员或者施工人员中分配过来的,这些工程监理人员严重的缺乏工程监理工作方面的专业知识,这必将导致较低的公路工程监理服务质量。所以,如果我国的公路监理企业想要得以迅速的发展和壮大,那么就必须加强对监理人员的学习与培训,提高监理人员的综合素质和综合业务水平,与此同时还应当加快工程监理人才的储备和培养。

4.3构建科学的监理企业体制

工程监理企业要想深化自身的改革,进行管理创新和体制创新是必不可少的。监理企业应当积极的建立现代化的企业制度,并充分的适应市场经济体制的需求,根据企业自身的特点完善法人治理机构。除此之外,还应当构建约束和激励机制,调动监理人员的主动性和积极性,增强他们的事业心与责任感,从根本上提高工程监理企业的核心竞争力,以适应新形势下经济市场的发展。

5.结束语

公路工程项目的建设是一个有机的整体,而工程监理的安全、费用、进度和质量的有效控制是非常重要的,因此,我国的工程监理企业应当尽快的解决自身发展中所存在的问题,科学合理的展开工程监理工作。此外,在公路工程项目的建设当中,工程监理的工作人员的作用是极其重要的,这就要求监理人员不断的增强责任心,提高自身的专业素质和水平,并且在摸索中不断成长,积累经验,才可以切实的做好工程监理工作。

【参考文献】

[1]刘贵兵.小议公路工程监理[J].中国水运(下半月),2011(7).

[2]宋德燕.谈公路工程监理及质量控制措施[J].价值工程,2011(3).

[3]张向红.地方公路工程监理中存在的问题及对策分析[J].中国科技博览,2011(33).

第7篇

城市河道质量的好坏直接关系着该地区的生态环境、城市形象以及人文环境等多个方面的建设工作,同时,城市河道还具有普遍性以及多样性的特点,是当地政府主要推进的公益性工程。除此之外,城市河道工程也是影响人民群众自身利益的因素之一,直接影响着城市环境的发展以及经济的可持续发展。所以,必须提高对河道工程的建设管理,建立和完善河道整治工程监理制度,将该制度落实到监理工作的每一步,充分发挥出该制度的作用,真正使人民群众的利益落实到实处。

2工程监理师工作的主要内容

政府监督和社会监理共同组成了工程建设监理。其中,政府监督主要是指政府部门从整体上对城市河道建设过程的科学性、合法性等方面进行全面的监督管理。而社会监理则负责具体的实施,主要由社会监理单位受到业主的委托,对业主提供相应的专业技术以及专业建议,同时,根据合同制定的内容,对河道工程的资金投入、施工进度以及施工质量进行控制,并且还要做好对各方面的工作关系的协调。为了保证河道整治工程任务的顺利完成,应该对工程中重点项目进行目标管理,政府部门需要签订相应的目标责任书,对工程建设的内容、质量以及施工时间等方面的内容明确到具体的负责人。提高政府部门的责任意识,是整个施工过程实现公开化。河道整治工程具有施工工期长、涉及范围广、资金投入量大等特点,因此,监理工程师必须加强对河道工程建设过程中的规划、建设以及运营等方面实行全方位监督,将规划方案和施工方案结合周围施工环境、地理环境等进行比较,确保方案的可行性和科学性。并且还要严格控制资金的使用,按照合同规定以及工程实际施工情况合理拨付资金,制定相应的规章制度,促进城市河道整治工程的安全运行。

3关于整治工程监理工作的措施及建议

随着我国水利建设工程的发展,大部分水利工程已经实现了河道整治工程建设监理制,该制度在对资金投入管理、保证工程施工制度以及促进工程质量提高等方面起着重要的作用,但同时,在对河道整治工程中运用监理制度的过程中,还存在监理漏洞和问题,例如乡镇级别的政府部门以及相关建设单位针对水利工程建设监理认识上缺乏足够的重视程度,甚至还存在地区保护以及政府部分官员行政干预的现象,采用没有实行监理制度或是没有监理资格的建筑监理单位对工程进行监理任务;监理单位缺乏专业的河道整治工程监理团队,无法对工程进行科学、合理的监理;河道整治工程监理人员专业素质和专业技术存在较大的差异性等,这些问题严重制约了城市河道整治工程监理工作的发展,因此,解决这些问题,我们可以从以下几个方面进行:

(1)提高对城市河道整治工程监理工作检查。

目前,我国各个地区的地方政府以及大部分河道整治企业,对于城市河道整治工程监理制度的建立和运用有了一定的认识,但是,并没有充分认识到监理工程师在城市河道整治的重要性。监理工程师应该做好日常的河道整治安全巡视检查工作,掌握和了解河道整治工作的状态与进度。同时还要组织相关监理人员定期进行河道整治安全巡检活动,并将巡检的结果以及从中遇到的问题进行仔细、完整的记录。同时,监理工程师应该利用各种渠道加强对河道整治工程监理工作重要性的宣传,提高乡镇一级政府人员对其河道整治工程建设监理制重要性的认识,进一步推动监理制度的建立,为其营造良好的社会环境,促进城市河道整治监理工作的提高。

(2)监理工程师形使项目安全整治监理的职责。

城市河道整治工程具有施工周期长、工程建设集中以及工程施工量大等特点,工程监理师应该结合有关法律、制度等,行使自身的安全整治监理职责。在对城市河道进行综合治理时,需要按照有关规定实行工程治理,并且还要采用高素质、监理经验丰富的监理团队对施工现场实行全程监控,用以确保城市河道整治工作的顺利进行。同时,对于施工时间段、任务重的河道整治工程,监理工程师在保证其工作质量符合标准之外,还能够保证其在规定的施工工期内完工。因此,我们可以看出,监理工程师落实其安全整治监理职责能够进一步促进河道整治工作质量的提高。

(3)充分、合理的利用监理职权。

安全监理工程师应该认真贯彻落实《建设工程安全生产管理条例》,在对河道工程进行监理的过程中,监理工程师有权制止河道整治工程中存在的违章指挥、违规操作等行为。如果发现在工程施工过程中存在安全隐患,有权要求施工单位对项目工程进行整改,并且及时向总监理工程师汇报,如果情况严重,应当要求施工单位暂停施工,并立即向相关部门汇报。同时还需要对河道整治工程中监理制度出现的问题进行记录、分析、总结,并将分析、总结后的结果用于对河道整治监理制度的进一步完善,从而建立、健全河道整治监理组织体系和相应的制度体系,形成公平、科学、公开的建设监理市场,保证城市河道整治工程有效运行,为建设和谐的生态环境、提高城市形象以及人文建设做出重要的贡献。

4结束语

第8篇

关键词:房建工程;安全控制;工程监理

引言

随着工程项目的不算增加,相关的安全风险也不断提高,导致工程监理人员在整个工程项目中扮演的角色越来越重要。其中对监理人员的要求应该不断提高,确保人员尽职尽责,从而保证每一个施工环节可以做到安全施工,从而提高整个施工质量水平。工程监理的另一个作用就是可以对当前的施工情况进行有效把握,通过一定的控制手段对不必要费用进行降低,从而在提高工程质量的同时降低工程成本。本文将会对房建工程中工程监理的作用进行阐述。

1 房建工程中的安全控制分析

1.1 制定有效的安全保障措施

对房建工程监理人员的选择应该从一定的技术层面出发,保证相关的监理人员对整个工程的施工环节以及相关图纸非常熟悉,并结合具体的施工流程以及施工环境,提出安全可靠的防护性措施,以保证施工安全。在这一过程中,对其中安全隐患的控制也是衡量工作人员工作能力以及责任意识的重要方面。通过对具体情况下安全隐患的分析,将其中的责任进行分散,保证每一部分落实到相应的工作人员身上,保证工作质量。另外,就每一个工程的应急措施也应该提前做好相应的策略,保证防患于未然。定期对员工进行培训审查,提高工作人员的整体素质。

1.2 做好施工现场安全控制

对施工现场进行安全控制,是涉及到整个工程安全施工的重要方面。对相关工作人员的选择必须保证专业,同时还需要成立监理单位与施工单位共同合作的工作小组,确保施工的安全性。在此期间,工作人员应该对施工现场进行定期的检查,同时将该项工作落实到具体的每一个人,加强责任意识。另外在施工中应该对使用的器材进行排查,保证合格之后才可以投入使用。对施工中出现的纠纷以及问题要做到及时有效处理,同时务必提前制定相关标准,做到严格把关,确保对安全性进行控制。

1.3 加强工程施工日常巡检

为保证施工安全,对施工进度进行有效控制,日常巡检必须在监理单位中引起重视。日常巡检的主要内容包括对施工人员安全护具的检查、对电梯的安全性检查、对施工材料的安全性检查、高空作业以及用电安全检查等。一旦发现问题应该及时处理,不可隐瞒,同时做好相关的记录工作。另外将检测的结果应该以报告的方式同时交给监理单位以及施工单位进行共同保管,确保双方对施工进度的有效把控。

2 房建工程中工程监理的内容

在房建工程中,工程监理的主要内容大致可以分为两个阶段:施工准备阶段以及施工阶段。只有保证两个阶段的工作质量,才能对整个工程的安全性进行负责。

2.1 施工准备阶段工程监理的内容

施工准备阶段,工程监理的主要内容是根据工程实施情况以及安全监理规划,制定相关的安全管理制度,保证在施工中处理问题时,做到有章可循。对施工单位应该做到详细的审查,同时将施工单位的施工经验以及相关资料进行明确。对施工单位的安全管理督查还应该体现在对相关人员的审查上,同时在监理单位配备安全管理的专业性人才,保证按照国家规范严格执行。对施工环节进行一定审查,同时对其中不合理的问题提出一定的修改意见,跟施工单位做好协商以及合作工作。施工前对施工人员进行严格的安全教育,对于保证工人安全有重要的现实意义。同时将培训的结果进行详细的记录,对于不合格的员工采取不予上岗的要求。根据施工的条件,制定合理的应急方案,以备不时之需。对于高危性工程,该跟建设单位以及施工单位共同协商,保证高效监督施工作业。

2.2 施工阶段工程监理的内容

进入施工阶段之后,工程监理单位应该就施工情况进行定期的检查,同时定期召开安全例会,对其中出现的问题及时处理,消除安全隐患。同时对施工单位提出报告要求,要求施工单位应该在施工期间定期上交阶段性安全控制措施方案。在施工过程中,就施工所用的材料以及器械应该进行定期的抽检,保证设备的安全性。对于具体的高危作业应该提前跟施工单位进行协商,制定一定的防护措施,保证施工人员可以进行安全施工。

3 房建工程安全控制中工程监理的作用

在房建工程安全控制中,工程监理的作用主要体现在以下三个方面:保障工程规划的规范合理性、加强施工技术监督,保证施工安全以及保证房建施工质量水平。

3.1 保障工程规划的规范合理性

房建工程项目确定之后,承包建设单位以及监理单位应该开始对工程进行全面的监理工作。同时对项目进行高效评估,就其中的问题进行研究,并对外提供有关项目的各种咨询工作。这对于提高项目建设的科学性和准确性具有重要的作用,还可以为之后的施工阶段打下良好基础。在具体工作时,可以根据实际情况对运营数据进行收集,并对其中经济可行性以及环境保护做出一定的研究,从而实现更好地安全控制效果,保证经济效益最大化。

3.2 加强施工技术监督,保证施工安全

在房建工程中,工程监理的主要作用就是监督作用,其中对施工人员的安全性监督是工作的主要内容。像高空作业对安全带的检测、施工所用设施的质量以及使用风险问题,都是监理工作人员重要的监督对象。另外对高空作业人员的鞋子以及穿着都会有明确的规定,同时对脚手架以及电梯和工作台都需要进行提前的审核,确保施工安全。在施工过程中,如果必须使用危险性器械时,应该就危险性器械的安全使用事项对施工人员进行详细的告知,同时对用电设备以及其他有安全隐患的设备做到实时监控,保证安全的施工环境。

3.3 保证房建施工质量水平

工程监理通过对施工过程中各个方面的监督,旨在提高项目的施工质量以及安全性。在具体的监督过程中需要对工程项目的进展、各个工程环节的协调、施工方案的审查以及工程竣工验收等多个方面有细致的了解。从而对工程施工进行全面的控制,就其中的具体施工事项制定出可实施的方案以及相关准则,同时将准则进行严格审查,通过不断的修改完善,最终在施工过程中加以运用。监督的过程中需要对承包商以及施工单位进行严格的审查,同时跟各部门之间保持良好的沟通,必要时在施工过程中对问题进行不断的协商解决,保证施工质量同时保证施工的灵活性。在最后的工程验收阶段,监理单位应该将整个过程中用到的检测报告,具体的施工情况以及方案改进进行上交,同时对施工质量进行认证,保证验收效果。

4 结束语

综上所述,房建工程不断促进国家经济的增长,也促进了区域经济的快速发展。但其中的安全性问题也一直是各界关注的重大问题。将监理工程在房建工程的安全控制中进行运用,对于提高工程质量,提高安全作业水平,具有重要的意义。目前国内对于监理部门的重视程度还应该加强,同时做好对相关专业性人才的选拔工作,就其中的问题进行不断改进、完善,针对具体的施工项目应该做到一定的应变处理,保证监理部门更好地为工程服务,创造更大的社会效益。

参考文献

[1]王家鼎.浅析工程监理的理论与实践[J].中国建设教育,2017(10):45.

第9篇

[关键词]环境工程监理;作用;内容;策略

中图分类号:X322 文献标识码:A 文章编号:1009-914X(2016)13-0160-01

2002年10月13日,我国六部门(水利部、交通部、铁道部等)以文件方式联合提出“环境工程监理”政策。该文件表明对某些重点建设项目进行试监理工程环境及工程环保措施具体执行情况。现阶段,我国仍在探索工程环境监理,并未统一、全面认识环境工程监理相关内容。鉴于此,本文从环境工程监理的作用及重点内容、改进环境工程监理工作的有效策略两个角度深入探讨了环境工程监理。

一、 环境工程监理的作用及重点内容

(一) 环境工程监理的作用

1. “三同时”执行情况方面的监督

“环境工程监理”初始目的为监督“三同时”执行情况。该目的确定,可对工程项目建设中“三同时”实行与环评文件要求不相符,无法同时建设环保设施或污染治理设施建设与环评文件要求不相符,对治理率进行擅自降低等问题进行有效解决。如此,可减少或避免新型建设项目从最初施工阶段就跻入“老污染源治理项目”行列。

2. 污染治理工程建设情况方面的监督

根据调查结果显示,现今很多运行的污染治理工程仍未满足稳定、长期的要求。即便某些工程建设项目已通过验收(验收方为环保部门),其也无法实现长期稳定运行。经研究,笔者发现工程材料的质量、工艺、设备质量等因素均会对污染治理工程建设造成影响。在这些因素的影响下,污染治理工程可长期、稳定达标排放的时间为3-36个月。

3. 其他环境工程监理作用

就其他环境工程监理作用而言,主要包括能够促使污染排放减少,可对生态环境进行保护;对保护管理模式进行改进,以促使管理质量提升;给予技术支持,以促使环保部门更好地决策,并减轻环保部门所承受的压力等。

(二) 环境工程监理的重点

1. 重点内容

对于环境工程监理重点内容,笔者将其总结、归纳为以下内容:其一,“三同时”能否于监督建设项目配套环保设施中实现;其二,对污染物治疗工程设计合理性或建设项目配套环保设施进行监督核实。此外,对配套环保设施与环评文件要求是否相符进行核实;其三,污染治理工程选用材料、选用设备或环保设施是否可以稳定、长期运行进行监督及核实;其四,对隐蔽工程(工程项目建设工程)进行跟踪,以保证“暗管”不存在,且对事故排放口位置及事故诱发因素进行标明;其五,对工程项目建设过程中是否落实环保措施进行监督及核实;其六,对是否全面培训环保设施运行维护人员进行监督及核实。此过程中,施工方执行监督核实,建设方被监督核实。

2. 深层意义

经深入了解,笔者得知一般意义上的“工程监理”与环境工程监理在本质方面存有差异性。立足于经济、技术、组织等角度,通过采取某些措施,监理经济投入、费用及质量,以实现工程建设的三大目标,进而为建设单位如期、保质保量完成任务提供有力保障是一般意义上的“工程监理”的任务及目的。保证建设项目切实执行“三同时”与污染治理工程稳定、长期运行,对整个工程建设中生态破坏及环境污染行为进行监督是环境工程监理的主要任务。环境受到建设项目的充分保护时环境工程监理的目的。对于监理对象,主体工程及其费用、建设进度、质量等是一般意义上的“工程监理”的监理对象。主体工程中的外部环境及环境保护工程是环境工程监理的对象。对于监理内容,“一协调,二管理,三控制”是一般意义上的“工程监理”的主要内容[2];环保措施具体落实情况、施工污染控制、临时及主体工程、景观环境、各方面利益的协调等为工程环境监理主要内容。环境工程监理除了注重监督、管理工程建设质量、工程建设进度等,更重视对工程稳定、长期运行进行监理。

二、 改进环境工程监理工作的有效策略

我国环境工程监理起步较晚,当前尚未成熟、完善[3]。鉴于此,须提早制定、施行有效措施,给予环境工程管理工作及时、科学指导,以防出现不和谐现象。

(一) 对法律法规进加以完善

就当前情况来看,我国并未制定环境工程监理方面的详细标准及规定,导致该项工作开展过程中无“规”可循,无“法”可依。此种情况下,相关部门应制定及颁布法律法规,用行政法规替代立法,在法律法规中确定有关内容(形式为制度)。

(二) 对环境工程监理规定及标准加以健全

通过制定、健全环境工程监理规定及标准,对监理性质、内容等进行明确。如此,可改善各地区自行理解、执行环境工程监理相关制度的现状,可节省大量人力、物力。规范及标准是环境工程监理制度全面实行的必要条件。由此可见,管理的规范化及科学化须以规范标准为基础。对此,笔者建议相关部门重视并加大研究及制定规范标准的力度,对环境工程监理相关内容加以明确。与此同时,对环境工程监理相关标准(考核指标、技术规范、收费、验收等标准)加以建立,以更好地指导监理单位及监理人员开展工作,进而为所有措施的有效性、合理性及可行性提供有力保障。

(三) 对监理队伍建设加大力度

对于环境工程监理,监理人员在其中发挥着极其重要的作用,因而应对准入门槛加以明确[4]。监理人员除了具备高水平专业知识(工程专业、环境工程及保护方面),还应熟悉相关法律法规(环境保护、工程建设等方面)。目前,大多数负责监理工作的人员并不具备环保知识、科学的环境工程监理方法等。所以,监理单位及监理人员应明晰、理解环境工程监理范围、内容、作用等,并对监理队伍的准入条件进行合理制定,以防出现上述情况,进而避免影响环境工程监理工作质量。

(四) 对环境工程监理范围加以明确

当前,人们普遍认为新建项目“三同时”执行情况为环境工程监理范围。其实不然,整个工程建设项目都应严格执行环境工程监理制度。此外,全程跟踪污染治理工程。以正确、合理、可行的工程方案为介入点,积极参与、审查施工图设计。与此同时,在招标过程中,给予业主一定的协助。如此,可对建设单位提供帮助,有利于其对相关环保措施及对策进行落实,进而有效、完善管理建设项目环境。

(五) 对约束机制加以建立

约束机制的建立,可促使企业自觉、积极遵守并执行环境监理相关制度[5]。现实中,推行环境工程监理制度会受到阻碍,例如:上文中所提及的政策、法律,业主的消极态度等。为推动工作,环境保护主管部门可在竣工验收资料中充分体现环境工程监理内容,以供环境评价及审批。

结束语

社会主义市场经济迅猛发展背景下,工程建设项目规模日益扩大,社会各界愈来愈重视环境工程监理。实践证明,环境工程监理有利于保护生态环境。我国环境工程监理起步较晚,当前仍处于探索阶段。所以,相关部门及人员应对环境工程监理进行不断研究、实践,注重观察、分析环境工程监理现状,促使其有效性提升。同时,对环境工程监理工作进行积极推动,以保证居民健康和生态环境的协调、可持续发展,从而实现经济、社会及生态效益。当前,该课题研究较少,希冀更多业内人士为此“添砖加瓦”。